Laserfiche WebLink
EXHIBIT "A" <br /> t:; easwenger Bloch and Associates <br /> February 14, 2008 CONSULTING ENGINEERS AND PLANNERS <br /> PHONE (305)944-5151 <br /> Rick Conker FAX(305)948-6290 <br /> Engineering&Public Works Director <br /> City of Sunny Isles Beach <br /> 18070 Collins Avenue <br /> Sunny Isles-Beach, FL 33160 <br /> Re: Meeting held for Bidders Evaluation <br /> Dear Mr.Conner. <br /> Thank you for meeting with us this morning to discuss our report for the Central Island Drainage and Street <br /> Improvements bidders' evaluation. As stated at the meeting, we feel that Southeastern Engineering Contractors, Inc. is best <br /> suited to perform this project for the City. <br /> As part of our services to the City we were tasked to review and evaluate the bids submitted for this project. The <br /> review consisted of bidder's reference checks, past projects verification and performance evaluations.by the projects owners, <br /> verification of proposed sub-contractors, the bidder's unit price schedule review, and also that they had:sufficient equipment <br /> fleets and forces to accornplish this project.. All of the reviewed contractors had contract work which extended past original <br /> completion dates,some because of unknown site conditions;work added by owners or contractor caused delays. <br /> Requests for additional information were sent to the following four(4) lowest bidders asking them to identify by bid <br /> Rein that work which would be performed by their own forces to constitute the 40%work required by the bid documents: <br /> %of Work <br /> Company Bid %over Low Bid By Own Forces <br /> • Tran Construction Inc. $3,532,842.00 low bid 44.60% <br /> • Southeastern Engineering Contractors, Inc. $3,635,852.00 2.92% 70.00% <br /> • Solo Construction Corporation $3,689,517.00 4.43% did not respond <br /> • Acosta Tractors Inc, Engineering Contractors $3,857,831.00 9.20% 71.43% <br /> As we had previously discussed with you, we feel that the City would be best served notilonly by the lowest bid but <br /> by a contractor specializing in this type of work. The low bidder Tran Construction Inc. is basically a Construction <br /> Management type operation which subs out mostly all of the work. Their references check lout and they come well <br /> recommended. They were late on a recent project for the City of Miami Beach, but the work was acceptable. (A copy of the <br /> e-mail requesting verification from the City of Miami Beach is available for your review.) <br /> Southeastern Engineering Contractors,. Inc is the second lowest bidders. They will perform 70% of the work with <br /> their own forces. Southeastern specializes in this type of project and has a history of successfullylcompleting these projects <br /> for local towns and municipalities, oftentimes getting additional work added to their contract. They are more in-line with the <br /> requirements that we feel are needed to address the special needs of the Central Island-Drainage and Street Improvements <br /> project.. This contractor is available to start work on this project in a timely manner. <br /> Please note that Beiswenger, Hoch &Associates has no financial interest in this bid process or any recommendation <br /> made by the City of Sunny Isles Beach. <br /> Sincerely yours <br /> BEISWENGER, HOCH &ASSOCIATES, INC. <br /> Victor Hugo G vara <br /> Vice President <br /> P.O. Box 1368, North Miami Beech, Florida 33160 0 1190 NE 163rd Street, Suite 203, North Miami Beach, Florida 33162 <br /> 68 <br />