My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Protest Hearing
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-10-02) Central Island Drainage
>
Bid Protest Hearing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2015 10:27:14 AM
Creation date
10/1/2015 10:26:58 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Officers are available, others may be approved. Fees are S40.00 per Officer/Hour for <br /> regular days and S60.00 per Officer/Hour during holidays. <br /> 6. Are there any requirements for notification to homeowners? <br /> Yes, contractor must notice homeowners and must have public awareness meetings. <br /> 7. Will the City pay for testing of density and concrete? <br /> Refer to DIVISION I, GENERAL SPECIFICATIONS, Section 7, Payment of Test by <br /> City. <br /> 8. Will the City pay for stored materials? <br /> NO. <br /> 9. What is the current condition of the existing drainage pipes to be desilted, and what <br /> percentage of the pipe is filled with dirt? <br /> Pipes to be desilted have been identified on plans attached to this Addendum. <br /> 10. Include the structures too in case need to be cleaned or will there be a new bid for that? <br /> Cost of drainage structure desilting, should be included in pipe desilting unit price. <br /> 11. Is there any exfiltration of the pipe or is it all solid pipe for drainage? <br /> No exfiltration pipes are used in this project. The project requires all solid pipes for <br /> drainage. <br /> 12. There are existing drainage pipes shown on the plans that are not labeled to be removed, is <br /> there any intent for these lines, abandonment? <br /> Existing drainage pipes not labeled to be removed are to remain. See sheet# 5 note#5 <br /> of the construction plans. <br /> 13. Would you consider muck removal as part of that? <br /> No excavation is considered for pipes to remain.For new sewer construction use special <br /> type of pipe bedding as indicated on sheet #37. <br /> 14. Paving: there are two types of road,curb and gutter, and you have a specific type of material; <br /> you ask for 1" milling, 2" resurfacing, and remove the existing pavement to approximately <br /> 1", use type S-1 asphalt concrete.? <br /> Use Type S-1 Mix, as per Miami-Dade County standards <br /> 15. You also say you want 2%slope, and sometimes you can't follow that detail and still have a <br /> 2% slope? <br /> Follow see detail on Sheet # 5. <br /> 16. But it has a lot of curb and gutter, and type S-1 asphalt concrete is not recommended to be <br /> used to mix for this final course any more. <br /> Use of Type S-1 mix in final course is approved by Miami Dade County. <br /> Bid 07-1002 he-Bid Conference QA Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.