Laserfiche WebLink
# 37. "DO NOT USE DRAINCRETE". <br /> 28. Is the City using FDOT or County specifications? Prices goes up or down. <br /> Use Miami-Dade County specifications standards. Price adjustment for asphalt will be <br /> as indicated in DIVISION II, Special Provisions, Section 27. Bituminous Material- <br /> Payment Adjustment. <br /> 29. Milling for depth or for crossroad correction, will that be answered in an addendum? <br /> Milling for depth. <br /> 30. In some areas where widening and type crossings are shown but there is no mention of <br /> asphalt work. What is the City's intent in these areas? There are a couple of areas of milling <br /> and resurfacing here and there, so are you going to leave it? <br /> Whatever we are resurfacing there has to be milling. We have two cases: milling and <br /> resurfacing; and milling and overbuild <br /> 31. There are very specific FDOT requirements QC at the plant and at the roadway for asphalt. <br /> Is it going to be Miami-Dade County spec or FDOT spec because there is a significant <br /> difference? <br /> QC for asphalt will be as per Miami Dade County standards. <br /> 32. Regarding sod, is there a restriction as far as limits to which the City is facing? For instance, <br /> on North Bay Road we have to go between trees, how wide of an area, what are your limits <br /> for restoration of the sod, by the park especially? <br /> For landscape restoration after trench excavation, please refer to Sheet # 5, note # 17, <br /> and Pavement Restoration and Pipe Trench Detail on sheet # 37 <br /> 33. The equipment outside of that trench in the tracks will be the contractor's responsibility? <br /> YES. <br /> 34. What does the City consider the difference between a small tree and large tree? There seems <br /> to be a lot of large trees that need to be removed. <br /> Large trees are considered those which caliper is 18" or larger measured 48" from the <br /> ground. Small trees under 18". <br /> 35. The quantities represent the trench itself, not the tracks for restorations? <br /> Please refer to Sheet # 5, Note 17: "For construction of the sewer system contractor <br /> shall saw cut pavement along the proposed utility trench. Cost for backfill with suitable <br /> selected material and reposition of pavement, driveways or landscaped areas to its <br /> original conditions and elevations shall be included in the unit price for sewer <br /> construction." <br /> 36. What about Royal Palm trees? <br /> Please refer to answer to question # 34 <br /> Bid 07-10-02 Pre-Bid Conference QA Page 4 of 6 <br />