My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-0915 Special City Commission Meeting
SIBFL
>
City Clerk
>
City Commission Minutes
>
2015
>
2015-0915 Special City Commission Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2015 10:18:26 AM
Creation date
10/23/2015 11:11:19 AM
Metadata
Fields
Template:
CityClerk-City Commission
Meeting Type
1st Budget Hearing
Date (mm/dd/yyyy)
09/15/2015
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Summan• Minutes: Special Ciw Commission Meeting September 15, 2015 Sunmv Isles Beach, Florida <br />First Budeet Hearine <br />3B. Budget Ordinance (Public Hearing) <br />An Ordinance of the City Commission of the City of Sunny Isles Beach, Florida; Adopting <br />an Operating and Capital Improvement Budget for the Fiscal Year Commencing <br />October 1, 2015 through September 30, 2016, Pursuant to Section 200.65, Florida Statutes; <br />Authorizing Expenditures of Funds Established by the Budget; Authorizing Encumbrances; <br />Authorizing Issuance of Checks; Providing for Grants and Gifts; Providing for Local and <br />Federal Law Enforcement Trust Funds; Providing for Post Audit; Providing for Severability <br />and Providing for an Effective Date. <br />Action: City Clerk Hines read the title, and City Manager Russo presented a balanced Fiscal <br />Year 201 5/2016 Operating Budget and the five -year Capital Improvement Program. He went <br />over a few highlights and what has changed from the Budget Work Sessions to the Budget <br />that is before us. Our assessed value went up from about $7.56 Billion to about $9 Billion. <br />We took advantage of that increase and lowered our Millage Rate from 2.6 to 2.5, which <br />breaks down to approximately $1 Million given back to the taxpayers. We have added about <br />S700,000 to our Reserves of Fund Balance which will be coupled with what we have left at <br />the end of this fiscal year once it is closed out. The balance remaining was used to balance <br />our operating budget. <br />City Manager Russo said the significant changes from the Workshops we had in July are: we <br />reduced a full time position to part time in Fleet Management; and he had left this in as part <br />time because when you total up that entire budget which he is sure there is some savings in, <br />the budget totals approximately S850,000. It is split between some of our major departments, <br />and he still thinks on a part time basis he will get some value out of that. He thinks this was an <br />oversight that he didn't pick up in the budget but we added $140,000 to the Capital Budget to <br />do a full replacement of our phone system which is antiquated. We had budgeted S60,000 but <br />we really need S200,000 to do a complete upgrade replacement with all the equipment and <br />technology. We have an increase on the revenue side, we have got close to $90.000 in <br />increased revenue sharing, 5200,000 more in sales tax. On the expenditure side we added <br />about S 1 5,000 for a diesel fuel dispensing card reader system that we don't have now on our <br />City diesel pump. Also on the Capital side, we added what is broken down into two areas: <br />one is for general mitigation strategies, and the other is more specific, a more doable project, <br />at least in a shorter term, at the Newport Pier. In the Capital we are going to budget about <br />S750,000 towards planning and hopefully we will move forward on some mitigation strategies <br />with the coming finalization with our report that is being done by our consultants. <br />City Manager Russo read a short summary from his Budget Message to summarize some of <br />the key things that are in the total Capital budget. We continue to make completion of the <br />projects that we have had in the hopper for a number of years, priority for this year. At the <br />same time we are planning for the addition to the Government Center Complex just north of <br />here, which will include a 6 to 8 grade school. a Civic Senior Center, commercial office <br />space, and some expansion for the City Government offices. The most complicated project <br />will be the undergrounding of our utility distribution wires, and he is happy to say he expects <br />by the end of October we will be going out to bid for the installation of all the conduits that <br />have to be put in place prior to the actual wiring contract. That will be a significant step <br />forward on this project, and the total estimated cost will be approximately $15 Million. The <br />
The URL can be used to link to this page
Your browser does not support the video tag.