My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment A - 2015-3-13_Samson Park Technical Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-05-01) Samson Oceanfront Park Improvements
>
Attachment A - 2015-3-13_Samson Park Technical Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 10:00:19 AM
Creation date
11/12/2015 9:46:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMSON OCEANFRONT PARK <br />CITY OF SUNNY ISLES <br />TECHNICAL SPECIFICATIONS <br />UNIT MASONRY 040500-11 <br />I. At all locations where window frames or hollow metal door frames butt split-faced masonry block, <br />Contractor shall provide proper transition to smooth faced concrete block for proper joint <br />conditions. <br /> <br />3.05 MORTAR BEDDING AND JOINTING: <br /> <br /> <br />A. Lay solid masonry units with completely filled bed and head joints; butter ends with sufficient <br />mortar to fill head joints and shove into place. Do not slush head joints. <br /> <br />B. Lay hollow concrete masonry units with full mortar coverage on horizontal and vertical face <br />shells. Bed webs in mortar in starting course on footings and in all courses of piers, columns, and <br />pilasters, and where adjacent to cells or cavities to be reinforced and/or to be filled with grout. For <br />starting course on footings where cells are not grouted, spread out full mortar bed including areas <br />under cells. <br /> <br />C. Maintain joint widths shown, except for minor variations required to maintain bond alignment. Do <br />not exceed joint thickness indicated by more than plus or minus 1/8 inch. If not shown, lay walls <br />with 3/8 inch (9.6 mm) joints. <br /> <br />D. Cut joints flush for masonry walls to be concealed or to be covered by other materials, unless <br />otherwise indicated. <br /> <br />E. Tool exposed joints as follows: <br />1. Concrete Block: Tool slightly concave using a jointer larger than the joint thickness, unless <br /> otherwise directed by Architect. Consult Architect prior to starting work. <br /> <br />F. Remove masonry units disturbed after laying; clean and reset in fresh mortar. Do not pound <br />corners or jambs to shift adjacent stretcher units, which have been set in position. If adjustments <br />are required, remove units, clean off mortar and reset in fresh mortar. <br /> <br />3.06 <br /> <br />CAVITIES/AIR SPACES: <br />A. Keep cavities/air spaces clean of mortar droppings and other materials during construction. Strike <br />joints facing cavities/air spaces flush. Place prefabricated cavity protection devices at base of open <br />cavities to prevent clogging of weepholes. Follow manufacturer's directions for installation of <br />cavity protection material. <br /> <br />B. Tie exterior wythe to backup with individual metal ties. Stagger alternate courses. <br /> <br />C. Cavities and air spaces found not to be clean by the Architect shall be cleaned by the Contractor at <br />no additional cost to the Contract, even if masonry is required to be removed and then replaced. <br /> <br />3.07 HORIZONTAL JOINT REINFORCEMENT: <br /> <br /> <br />A. General: Provide continuous horizontal joint reinforcement as indicated. Install longitudinal side <br />rods in mortar for their entire length. Longitudinal side rods shall engage outer face shell of unit <br />by at least ~ inch. Wire wall ties shall be embedded at least 1- ½ inches into the mortar bed of <br />solid masonry units or solid grouted hollow units. Lap reinforcing a minimum of 6 inches. <br /> <br />B. Cut or interrupt joint reinforcement at control and expansion joints, unless otherwise indicated. <br /> <br /> <br />C. Provide continuity at corners and wall intersections by use of prefabricated "L " and "T" section. <br />Cut and bend reinforcement units as directed by manufacturer for continuity at returns, offsets, <br />column fireproofing, pipe enclosures, and other special conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.