My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment A - 2015-3-13_Samson Park Technical Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-05-01) Samson Oceanfront Park Improvements
>
Attachment A - 2015-3-13_Samson Park Technical Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 10:00:19 AM
Creation date
11/12/2015 9:46:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMSON OCEANFRONT PARK <br />CITY OF SUNNY ISLES <br />TECHNICAL SPECIFICATIONS <br /> <br /> <br />CUTTING AND PATCHING 01045-2 <br /> B. Operational and Safety Limitations: Do not cut and patch operational elements or safety related <br />components in a manner that would result in a reduction of their capacity to perform in the manner <br />intended, including energy performance, or that would result in increased maintenance, or decreased <br />operational life or decreased safety. <br /> <br /> C. Visual Requirements: Do not cut and patch work exposed on the building's exterior or in its occupied <br />spaces, in a manner that would, in the Engineer's opinion, result in lessening the building's aesthetic <br />qualities. <br /> 1. Do not cut and patch work in a manner that would result in substantial visual evidence of cut and <br />patch work. <br /> 2. Remove and replace work judged by the Engineer to be cut and patched in a visually unsatisfactory <br />manner. <br /> 3. Retain the original installer or fabricator if possible, or another recognized experienced and <br />specialized firm for cutting and patching. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.01 MATERIALS <br /> <br />: <br /> A. General: Except as otherwise indicated, or as directed by the Engineer, use materials for cutting and <br />patching that are identical to existing materials. <br /> <br /> B. If identical materials are not available or cannot be used, use materials that match existing adjacent <br />surfaces to the fullest extent possible with regard to visual effect. <br /> <br /> C. Use materials for cutting and patching that will result in equal-or-better performance characteristics. <br /> <br /> <br />PART 3 - EXECUTION <br /> <br />3.01 INSPECTION <br /> <br />: <br /> A. Before cutting, examine the surfaces to be cut and patched and the conditions under which the work is to <br />be performed. If unsafe or otherwise unsatisfactory conditions are encountered, take corrective action <br />before proceeding with the work. <br />1. Coordinate layout of the work and resolve potential conflicts before proceeding with the work. <br /> <br />3.02 PREPARATION <br /> <br />: <br /> A. Temporary Support: To prevent failure, provide temporary support of work to be cut. <br /> <br /> B. Protection: Protect other work during cutting and patching to prevent damage. Provide protection from <br />adverse weather conditions for that part of the project that may be exposed during cutting and patching <br />operations. <br /> 1. Avoid interference with use of adjacent facilities or interruption of free passage to adjacent <br />facilities. <br /> 2. Take precautions not to cut existing pipes, conduits or ducts serving the building but scheduled to <br />be relocated until provisions have been made to by-pass them. Coordinate with the Engineer. <br /> <br />3.03 PERFORMANCE <br /> <br />: <br /> A. General: Employ skilled personnel to perform cutting and patching work. Except as otherwise indicated
The URL can be used to link to this page
Your browser does not support the video tag.