My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment A - 2015-3-13_Samson Park Technical Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-05-01) Samson Oceanfront Park Improvements
>
Attachment A - 2015-3-13_Samson Park Technical Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 10:00:19 AM
Creation date
11/12/2015 9:46:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Samson Oceanfront Park <br />City of Sunny Isles <br />Technical Specifications <br />EARTHWORK 02200-5 <br /> <br />7. Perform backfilling simultaneously on all sides of structures. <br /> <br />C. Unclassified Backfill shall be placed in 12-inch lifts to the lines and grades shown on the drawings <br />or as approved by the ENGINEER. The CONTRACTOR shall compact unclassified backfill to a <br />density approximating the density of surrounding native material and in a manner that will not <br />allow settlement of the completed area. <br />3.05 MAINTENANCE: <br /> <br />A. The CONTRACTOR shall protect newly graded areas from actions of the elements. <br /> <br />B. The CONTRACTOR shall fill, repair and re-establish grades to the required elevations and slopes for <br />any area that shows settling or erosion occurring prior to seeding . <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.