My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment A - 2015-3-13_Samson Park Technical Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-05-01) Samson Oceanfront Park Improvements
>
Attachment A - 2015-3-13_Samson Park Technical Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 10:00:19 AM
Creation date
11/12/2015 9:46:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Samson Oceanfront Park <br />City of Sunny Isles <br />Technical Specifications <br />EROSION, SEDIMENTATION AND DUST CONTROL 02270-2 <br /> <br />2.03 <br /> <br />SILT FENCING: <br />A. Geotextiles shall be woven or nonwoven fabrics that will allow the passage of water. Geotextiles shall <br />be packaged in a protective covering sufficient to protect it from sunlight, dirt, and other debris during <br />shipment and storage, upon which the manufacturer’s name, product name, style number, roll <br />dimensions and LOT numbers are clearly labeled. <br /> <br />B. Posts: Posts for silt fences shall as shown in the drawings and be either wooden stakes or metal stakes <br />with a minimum length of 3 feet. Steel posts shall have projections for fastening wire to them. <br /> <br />C. Silt Fence shall be a pervious sheet of propylene, nylon, polyester or ethylene yarn and shall be <br />certified by manufacturer or supplier as conforming to the following requirements: <br /> <br />Physical Property Test Requirements <br />Permittivity ASTM-D-4491 .05 SEC-1 <br />Grab tensile ASTM-D-4632 90 lbs. (min. warp) <br />Grab Sewn Strength ASTM-D-4884 2.1 lb/in (min) <br />Trapezoidal Tear ASTM-D-4533 35 lbs. (min) <br />UV Resistance ASTM-D-4355 80% (500 hrs) <br />Filtration Efficiency ASTM-D-5141 75% (min) <br />Flow Rate ASTM-D-5141 .3 gal (min) <br /> <br />The base plastic shall contain stabilizers and/or inhibitors to make the filaments resistant to <br />deterioration due to ultraviolet light, heat exposure and potential chemically damaging environment. <br />The fabric shall be free of any treatment which may significantly alter its physical properties. The <br />edges of the fabric shall be selvaged or otherwise finished to prevent the outer yarn from pulling away <br />from the fabric. <br /> <br />D. Other materials: Select all other materials not specifically described but required for compliance with <br />the erosion and sediment control plan, subject to approval by the Engineer. <br /> <br />2.04 FILTER FABRIC <br /> <br />: <br />A. Filter Fabric for inlet protection shall be Type D-3 per FDOT Index 199. <br /> <br />2.05 <br /> <br />AGGREGATES: <br />A. Aggregate for Truck Wash Out area shall be coarse aggregate as described in Section 901 excluding <br />901-2.3 of the FDOT Standard Specifications for Road and Bridge Construction. Aggregates shall be <br />FDOT size No 1. If this size is not available, the next available smaller size aggregate may be <br />substituted with the approval of the Engineer. Sizes containing small aggregate will track off the <br />project and are unsuitable. <br /> <br />PART 3 - EXECUTION <br /> <br />3.01 <br /> <br />GENERAL: <br />A. Contractor shall familiarize himself with all the stipulations and requirements of the erosion and <br />sediment control plan. Contractor shall be held responsible for strict adherence to the FDEP generic <br />permit. Contractor shall be deemed liable for any negligence or infringement, which results in non- <br />compliance with this permit. <br /> <br />B. The location of all sediment and erosion control measures shall be left to the Contractor’s discretion <br />unless otherwise shown on the Drawings or required by the permit. Should there be no requirement of <br />an erosion control plan, then Contractor shall be required to provide such measures necessary to
The URL can be used to link to this page
Your browser does not support the video tag.