Laserfiche WebLink
'NE 15 El U L5 I 11 <br /> NOV 1 0 2015 _Di <br /> DESIGN FEASIBILITY <br /> PLANNING & ZONING DEPT. <br /> Once it is determined by the reviewing agencies, that the proposed pedestrian crosswalk is <br /> warranted and does not impact the safety and operations of the adjacent roadways, a conceptual <br /> design of the crosswalk will be developed. The conceptual design will identify location of <br /> crosswalk, modification to existing signal, pedestrian signal equipment location, requirements <br /> for easements, signing/markings and roadway modifications. <br /> SCHEDULE <br /> Mid-Block Pedestrian Crosswalk Warrant Analysis 3 weeks <br /> FDOT/City Review 2 weeks <br /> Operational and Safety Analysis 2 weeks <br /> FDOT/City Review 3 weeks <br /> Design Feasibility 2 weeks <br /> FDOT/County/ City Review 3 weeks <br /> • <br /> Estimated Construction Cost- $250,000 to $300,000 <br /> • <br /> w:\l5\15158\ped crossing\ped crossing methodology_rev.docx <br />