Laserfiche WebLink
• <br /> . _ . . <br /> 2. Like at Jade Signature, rattler than have gravel or stone entrances and exits <br /> • „ • ... . <br /> to/from the construction site, we will have the contractor provide and maintain a <br /> reinforced Concrete apron, which is much easier to clap and maintain as <br /> Opposed to gravel/stone On thejObtiteside of the concrete aprons, the <br /> -.ToOntriaOtOrwill install the .WaSh-down-grating described abbVe. - <br /> 3; Curb inlets in Collins Avenue along the length of the site will receive erosioti. • - <br /> cc:intro! measuret in accordance with the.soon to be-prepared, submitted and <br /> approved erosion control plan, There are Vailput types of these curb gutter inlet <br /> sediment prevention devices and our contractor Will coordinate with the City and <br /> FOOT...Additionally, the sediment that gets Collected Or-the outside Of the <br /> . <br /> sediment prevention device will be cleaned daily to prevent'Clogging, water <br /> pondingTand-sediment-,build up <br /> 4. The full-time gate attendants will receive specific training on cleaning and <br /> maintenance —They willmash-downT-sweep;-and-reMoye-any.dirt-,--seciinient-,- and - - <br /> debris, whether deposited from thejObSite or not These full-time gate attendants <br /> • • . <br /> Will also keep all sidewalks elkar; clan, and safe at all•tirtie7t aTnii„tikg at Jade <br /> • • <br /> t _ <br /> Signature, will-be-trained to deal with non-construction related pedestrian and- <br /> Vehicular traffic. <br /> 5. -the contractor will set up numerous water souices on-site for project individuals <br /> to _ <br /> spray down the site to minimize wind-blown dirt/sand frotn-leaVing:the pfoject. <br /> During site preparation aild_grapling;a-Watertruck-willrbe.used,t6 Wt the Site. <br /> Fencing: Construction fencing must be Constructed of'durable Mate-rial, and additional <br /> silt fencing for additional protection Gates shbuldbe steady and properly secure during <br /> non7woi-king hours. <br /> We take great pride in the "face" of our construction sites (the fencing) and require our <br /> contractors toinstall,temporary-construction feri(ihg:th4t-is cOnStrtiCied-in,a-permanerit <br /> manner and in accordance with the City pf Sunny,11 §..‘Re.a.ch Te..quiremepts. The <br /> fencing will be constructed of thiCk; durable plywood that will either be Painted Or <br /> reCeiVe:fastenerrattached metal:Panel-tig-nage.,(sirriTlatztO-JadezS:igriature): The plywood <br /> will be securely mounted to an.-engineered -stnidiiiraltc4515:0--tt.wate_MTTioe Of either <br /> solid wood posts and stringers or hollow-ttrudulal steel.(1087Shapet embedded into <br /> hCles and encased in concrete. The back side bfthéféncewillbélined With silt fence to <br /> prevent sediment run-off from the jobsite, under the fence, onto the sidewalk or other <br /> adjacent areas. <br /> All gates will be sliding gates, rather than swinging gates, to ensurelhat the gates do <br /> not accidentally swing into the ri§ht-of-Way due-1014e strong winds in Sunny Isles <br /> Beach. The gates will be constructed of-the,same material§ as theifencing in order to <br /> match the fence and provide a consistent look for the project All g-ateS Will be secured <br /> with high-strength pad locks when Closed end of each day: .During the day, we <br /> - • - -have-full-titne-attendants-at-all.6Pen-gratet4-61-preVent4naUttiOilid-d-decess-and-- - - - <br /> _• . _ <br /> ensure the safety of the public. This may also inalUde providing a "warning barrier" in <br /> 10 <br />