My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2015-2473
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2015
>
Reso 2015-2473
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 2:20:34 PM
Creation date
12/3/2015 2:20:33 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2015-2473
Date (mm/dd/yyyy)
10/15/2015
Description
Change Orders 2 & 3 Fla. Engineering & Dev. Corp. 174th St. Roadway Imp
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Florida Engineering&Development Corp <br /> 12076 NW 98th Ave. �7 <br /> Hialeah Gardens FL 33018 'FLORIDA ENGINEERING <br /> &DEVELOPMENT CORP. <br /> Project:NE 174th Street Roadway Improvements <br /> Scope of work:Sidewalk Reconstruction West side of the intersection of 174th and NBR <br /> Location: NE 174th Street <br /> Date: 9/14/2015 <br /> PROPOSED CHANGE ORDER No. 2 Sidewalk and Curbs <br /> TABLE OF QUANTITIES <br /> No. Item Qty Unit Unit Price Total <br /> A) Mobilization and Demobilization(Item 1 contract) <br /> 1 Project Manager 24 Hrs $ 70.00 S 1,680.00 <br /> 2 Project Superintendent 136 Hrs S 60.00 5 8,160.00 <br /> 3 Equipment Transportation 2 Ea $ 400.00 S 800.00 <br /> 4 Truck Superintendent 17 Day $ 57.50 $ 977.50 <br /> Sub-Total S 11,617.50 <br /> B) MOT(item 2 Contract) <br /> 5 Laborer(2)Set up Maintenance 36 Hrs $ 28.98 $ 1,043.28 <br /> 6 Police Officer 136 Hrs $ 60.00 S 8,160.00 <br /> 7 Barricades/Signs 17 Day S 355.00 $ 6,035.00 <br /> Sub-Total $ 15,238.28 <br /> C) SPPP&NPDES•Dust Control(Item 7 Contract) <br /> Equipment <br /> 8 Water Truck With Driver 30 Hrs $ 103.95 $ 3,118.50 <br /> Sub-Total $ 3,118.50 <br /> 0) Demolition(sidewalk;F-curb) <br /> Labor <br /> 9 Foreman 40 Hrs $ 54.34 $ 2,173.60 <br /> 10 Operator(1) 40 Hrs $ 42.26 $ 1,690.40 <br /> 11 Laborer(2) 80 Hrs $ 28.98 $ 2,318.40 <br /> Equipment <br /> 12 Backhoe 40 His S 105.00 $ 4.200.00 <br /> 13 Truck(hauling) 30 Load $ 137.50 S 4,125.00 <br /> Sub-Total S 14,507.40 <br /> E) Adjust covers for existing utilities(Item 70) <br /> 14 Reset Existing Valve Est(9+97.00N,11+46.00S. <br /> 14+92.00N,16+52.00N,17+0.00N, 18+5.00N,18+62.00S 7 Ea $ 263.25 $ 1,842.75 <br /> 15 Adjust Existing Manhole(Est 19+42.00) 1 Ea S 435.50 $ 435.50 <br /> Sub-Total $ 2,278.25 <br /> F) Subcontractor <br /> 16 Testing-subcontractor 1 Ls $ 1,735.65 <br /> 17 Survey and As-Built 1 Ls $ 4,327.67 <br /> Sub-Total $ 6,063.32 <br /> Sub-total $ 52,823.25 <br /> 15%Overhead,Profit S 7,923.49 <br /> Subtotal PCO#2 $ 60,746.74 <br />
The URL can be used to link to this page
Your browser does not support the video tag.