Laserfiche WebLink
'CITY OF SUNNY ISLES BEACH ,` °4 <br /> x R`" - - 7 18070,Colhns Avenue - , <br /> • <br /> y ~ Sunny Isles Beach Flondo`33160 "" <br /> } 305 947 ObOb _ 0* , <br /> ' . wwwsibf net '�tF `^ <br /> a <br /> 'S, '•nOs 4' <br /> Orn'OF SON <br /> tr. ea- <br /> • Streets temporarily restored, as described above, must be regularly maintained. For <br /> example, streets must be watered, new potholes filled and disturbed and adjacent paved <br /> streets swept. <br /> F. The Contractor shall employ and pay for the services of an independent testing laboratory to <br /> perform quality control services on work performed by the contractor. <br /> G. There is an available Geotechnical Investigation Report at the City of Sunny Isle Beach. <br /> • The above referenced report is no guarantee as to accuracy of completeness. <br /> • The Contractor is cautioned that this report has been utilized for general purposes only <br /> and may be inadequate for the purposes of bidding on the Contract items. <br /> • The availability of this report does not relieve the Contractor from his responsibility to <br /> familiarize itself with the subsurface conditions that may affect cost, progress and <br /> performance of work. <br /> 3.3 WORK PERFORMED BY OTHERS <br /> The City of Sunny Isles Beach or other contractors may perform work on the existing water <br /> distribution system or public utilities as part of their maintenance and operations. The Contractor <br /> shall conduct its operations so as to cause a minimum of interference with the work of such other <br /> contractors and/or public utilities, and shall cooperate fully to provide continuous safe access to <br /> their respective portions of the site to perform their respective contracts. <br /> 3.4 CONTRACTOR'S USE OF PREMISES <br /> See General Conditions. <br /> 3.5 WORK SEQUENCE, COORDINATION ACTIVITIES AND SCHEDULED DATES: <br /> A. General: Work under this contract shall be scheduled and performed in such a manner as <br /> to result in the least possible disruption to driveway access. The CONTRACTOR will coordinate its <br /> work with other adjacent contractors, landowners, residents and City activities, with specific <br /> attention to access and staging areas. Construction sequence shall be determined by <br /> CONTRACTOR subject to the following needs for continuous access and operation by others. <br /> 1. The work will be performed in residential/commercial neighborhoods. The CONTRACTOR <br /> shall reasonable minimize the inconvenience to the residents and property owners, and <br /> reasonably maximize the safety of the residents: <br /> 2. Construction activities shall take place between the hours of 8:00 PM to 7:00 AM. <br /> Deliveries shall be allowed between the hours of 8:00 PM to 7:00 AM. • <br /> 3. All open trenches and excavations shall be closed or covered, and be in good driving <br /> condition with temporary pavement, at the end of each work day. <br /> City of Sunny Isles Beach lin No. 15-12-02 <br />