Laserfiche WebLink
• Item 95: <br /> ADD this item as follows: <br /> Superpave Asphaltic Conc, Traffic C (1 1/2") / TN: This item shall cover the <br /> costs for all labor, materials, equipment needed to place asphaltic pavement <br /> outside FDOT project limits meeting the requirements in specification Section <br /> 02513. <br /> Measurement for payment shall be based on the amount of tons delivered and <br /> placed. <br /> • Item 96: <br /> ADD this item as follows: <br /> Asphalt Concrete Friction Course, Traffic C, FC-9.5 (1") / TN: This item shall <br /> cover the costs for all labor, materials, equipment needed to place asphaltic <br /> pavement outside FDOT project limits meeting the requirements in specification <br /> Section 02513. <br /> Measurement for payment shall be based on the amount of tons delivered and <br /> placed. <br /> • SECTION 01570 — TRAFFIC CONTROL (MAINTENANCE OF TRAFFIC) <br /> • Part 1 — General. Subsection 1.10 DESCRIPTION, Paragraph C: <br /> ADD paragraph C as follows: <br /> C. The CONTRACTOR shall maintain traffic control measures during the hours <br /> operation indicated on the Traffic Control Plans, sheet C-156, Project Notes# 3. <br /> • SECTION 15060 — CONDUIT AND FITTINGS <br /> • Part 2— PRODUCTS. Subsection 2.01 DUCTS, All Paragraphs: <br /> DELETE references to schedule 80 PVC conduit <br /> REPLACE with schedule 40 PVC conduit. <br /> • Part 2— PRODUCTS. Subsection 2.01 DUCTS, Paragraph D: <br /> ADD paragraph D as follows: <br /> D. All conduit shall be color coded. Contractor must submit for approval proposed <br /> color coding system prior to ordering the material. <br /> Monday. December 28. 2015 <br />