My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ROHL Networks, LP #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Responses
>
ROHL Networks, LP #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2021 10:07:13 AM
Creation date
1/7/2016 3:33:44 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Collins Ave. Utility Undergrounding
Bid No. (xx-xx-xx)
15-12-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Item 95: <br /> ADD this item as follows: <br /> Superpave Asphaltic Conc, Traffic C (1 1/2") / TN: This item shall cover the <br /> costs for all labor, materials, equipment needed to place asphaltic pavement <br /> outside FDOT project limits meeting the requirements in specification Section <br /> 02513. <br /> Measurement for payment shall be based on the amount of tons delivered and <br /> placed. <br /> • Item 96: <br /> ADD this item as follows: <br /> Asphalt Concrete Friction Course, Traffic C, FC-9.5 (1") / TN: This item shall <br /> cover the costs for all labor, materials, equipment needed to place asphaltic <br /> pavement outside FDOT project limits meeting the requirements in specification <br /> Section 02513. <br /> Measurement for payment shall be based on the amount of tons delivered and <br /> placed. <br /> • SECTION 01570 — TRAFFIC CONTROL (MAINTENANCE OF TRAFFIC) <br /> • Part 1 — General. Subsection 1.10 DESCRIPTION, Paragraph C: <br /> ADD paragraph C as follows: <br /> C. The CONTRACTOR shall maintain traffic control measures during the hours <br /> operation indicated on the Traffic Control Plans, sheet C-156, Project Notes# 3. <br /> • SECTION 15060 — CONDUIT AND FITTINGS <br /> • Part 2— PRODUCTS. Subsection 2.01 DUCTS, All Paragraphs: <br /> DELETE references to schedule 80 PVC conduit <br /> REPLACE with schedule 40 PVC conduit. <br /> • Part 2— PRODUCTS. Subsection 2.01 DUCTS, Paragraph D: <br /> ADD paragraph D as follows: <br /> D. All conduit shall be color coded. Contractor must submit for approval proposed <br /> color coding system prior to ordering the material. <br /> Monday. December 28. 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.