Laserfiche WebLink
PAY ITEM Quantity Unit Unit Costs Base Price <br /> PER 01020 _ <br /> Install only three (3)-6 inch PVC schedule 40 <br /> 16 lateral conduit bundled in one lateral trench 327 LF <br /> with others for FPL Utility (FPL to furnish <br /> material) <br /> Install only one (1)-2 inch PVC schedule 40 <br /> 17 lateral conduit bundled in one lateral trench 1 477 LF <br /> with others for FPL Utility (FPL to furnish <br /> material) <br /> Install only two(2)-2 inch PVC schedule 40 <br /> 18 lateral conduit bundled in one lateral trench 495 LF <br /> with others for FPL Utility (PL to furnish <br /> material) <br /> Install only three (3)-2 inch PVC schedule 40 <br /> 19 lateral conduit bundled in one lateral trench • <br /> 1 397 LF <br /> with others for FPL Utility (FPL to furnish <br /> material) <br /> Install only six (6)-2 inch PVC schedule 40 <br /> 20 lateral conduit bundled in one lateral trench 1 388 LF <br /> with others for FPL Utility (FPL to furnish <br /> material) <br /> Install only one(1)-6 inch PVC schedule 40 <br /> 21 lateral conduit in one lateral trench exclusive 720 LF <br /> for FPL Utility(FPL to furnish material) <br /> Install only two(2)4 inch PVC schedule 40 <br /> 22 lateral conduit in one lateral trench exclusive 63 LF <br /> for FPL Utility(FPL to furnish material) <br /> Install only three (3)4 inch PVC schedule 40 <br /> 23 lateral conduit in one lateral trench exclusive 215 LF <br /> for FPL Utility (FPL to furnish material) <br /> Install only six(6)4 inch PVC schedule 40 <br /> 24 lateral conduit in one lateral trench exclusive 351 LF <br /> for FPL Utility (FPL to furnish material) <br /> Install only one(1)-2 inch PVC schedule 40 <br /> 25 lateral conduit in one lateral trench exclusive 129 LF <br /> for FPL Utility (FPL to furnish material) <br /> 26 Install only feeder splice box for FPL Utility 11 EA <br /> (FPL to furnish material) <br /> Install only concrete pad for vista switch <br /> 27 cabinets for FPL Utility (FPL to furnish 18 EA <br /> material) <br /> 28 Install only 50" splice box for FPL Utility (FPL 20 EA <br /> to furnish material) <br /> 29 Install only 48"handhole for FPL Utility (FPL to 2 EA <br /> furnish material) <br /> Install only 30"handhole for FPL Utility (FPL to <br /> 30 2 EA <br /> furnish material) <br /> 31 Install only 24"handhole for FPL Utility (FPL to 18 EA <br /> furnish material) <br /> 32 Install only 12'x8' manhole for FPL Utility(FPL 1 EA <br /> to furnish material) <br /> Install only concrete pad for transformers, <br /> 33 capacitor banks and fuse cabinets for FPL 26 EA <br /> Utility (FPL to furnish material) <br /> 00300-4/26 <br />