Laserfiche WebLink
Major Projects Completed 6 years <br /> Cutler Substation Feeder Relocations 750,000 Directional Bore&Trench 2015 <br /> multiple feeder relocations <br /> approx.2000'with <br /> Substation connections <br /> Town of Gulf Stream 1,341,000 OH-UG Conversion of Utilities Town of Gulf Stream 2014 <br /> in Upscale Residential Area <br /> EVERGLADES ISLAND 481,734 OH-UG Conversion of Utilities <br /> in Upscale Residential Area Town of Palm Beach 2013 <br /> SHERIDAN VILLAGES SIGNALIZATION 189,503 Signalization of Intersection for <br /> new construction Altman Contractors 2013 <br /> WILCOX CSX RR CROSSING 198,411 Directional Bore Crossing of CSX <br /> Railroad FPL 2013 <br /> DOVER AFB PHASE 1 2,510,712 OH-UG distribution conversion <br /> on Air Force Base USAF 2012 <br /> FAU STADIUM DUCT BANK(w/0823) 488,506 Feeder and Duct Bank <br /> Installation to FAU Stadium FAU 2012 <br /> LEE 230KV CC SWITCHYARD NC 968,668 Substation and switchyard <br /> installations Progress Energy 2012 <br /> FPL NORTHWOOD FEEDER UPGRADE 246,145 Overhead Distribution <br /> Installation FPL 2012 <br /> FPL AVOCADO FEEDER UPGRADE 456,059 Overhead Distribution <br /> Installation FPL 2012 <br /> CAPE CORAL TRANSMISSION 5,100,373 138KV Transmission Duct Bank <br /> Installation LCEC _ 20.11_ <br /> FLAGLER MEMORIAL BRIDGE 799,441 Directional Bore across <br /> Interdastal Waterway FPL 2011 <br /> ROCK SPRINGS SUBST.138/69KV 209,966 Substation Installation <br /> Dominion Power 2011 <br /> DAYTONA PLOW(HC) 153,331 Intercosatal Feeder Crossing <br /> Casper Colosimo 2011 <br /> FAU BLVD IRM 284,812 FAU Blvd Extensio to <br /> accomofdate new Stadium UG FAU 2011 <br /> FPL CONGRESS FEEDER UPGRADE 413,825 Overhead Distribution <br /> Installation FPL 2011 <br /> CAPRI FEEDER(SC) 381,736 Directional Bore along <br /> Environmentally Sensitive Area FPL 2011 <br /> KENNEDY SPACE CENTER 1,349,462 Replace Overhead 15KV ple line <br /> throughout compound NASA 2010 <br /> CLYDE MORRIS 350,974 Concrete Encased Distribution <br /> Duct Bank FPL 2010 <br /> DUNLAWTON AVE 19,976 OH-UG conversion of FPL <br /> Facilities Daytona Beach Shores 2010 <br /> CITY OF CAMDEN-DEKALB SUBSTATI 188,399 Substation Foundation and <br /> Switch Installation City of Camden 2010 <br /> VILLAGE AT GULFSTREAM 2,320,611 Concrete Encased Distribution <br /> Duct Bank Law Company 2009 <br /> DAVIE BLVD NEW RIVER BORE 115,301 Directional Bore Feeder across <br /> the New River FPL 2009 <br /> HALIFAX SUBSTATION DAYTONA 623,932 Concrete Encased Distribution <br /> Duct Bank FPL 2009 <br /> EVERNIA SUBST.DUCT BANK 877,994 Concrete Encased Distribution <br /> Duct Bank FPL 2008 <br /> NORTHEAST SUBSTATION 321,771 230 KV Transmission Duct Bank <br /> Progress Energy 2008 <br /> FAU SCHOOL OF ENGINEERING 1,022,329 Feeder Installation from <br /> Substation to Chiller Building FAU 2008 <br />