Laserfiche WebLink
Proposal <br /> From: Danella Utility Construction Inc. Project: COLLINS AVE UTILITY UNDERGR <br /> 170 Commerce Rd Description: OH/UG CONVERSION ON COLLINS <br /> Unit 5 AVE IN SUNNY ISLES FL <br /> Boynton Beach, FL 33426 <br /> Phone: 561-327-5320 <br /> Fax: 561-327-5319 <br /> ITEM DESCRIPTION BID QTY U/M UNIT BID AMOUNT <br /> General Items <br /> 1 Bonds and Insurance 3.000 % 70,000.00 5210,000.00 <br /> 2 Mobilization 1.000 LS 61,735.50 $61,735.50 <br /> 3 Maintenance of Traffi 15.000 Month 26,500.00 $397,500.00 <br /> 4 Testing, Surveying a 1.000 LS 205,550.00 5205,550.00 <br /> 5 Indemnification Allow 1.000 LS 100.00 $100.00 <br /> General Items <br /> Section Total: $874,885.50 <br /> Labor and Equipment <br /> 6 One 6" PVC SCH 40 5,778.000 LF 45.35 $262,032.30 <br /> 7 Two 6" PVC SCH 40 1,708.000 LF 46.95 580,190.60 <br /> 8 Three 6" PVC SCH 4 91.000 LF 48.95 $4,454.45 <br /> 9 One 2" PVC SCH 40 691.000 LF 37.20 525,705.20 <br /> 10 Two 2" PVC SCH 40 286.000 LF 39.50 511,297.00 <br /> 11 Three 2" PVC SCH 4 5,300.000 LF 41.45 5219,685.00 <br /> 12 Six 2" PVC SCH 40 1,539.000 LF 48.95 $75,334.05 <br /> 13 Nine 2" PVC SCH 40 75.000 LF 51.20 53,840.00 <br /> 14 One 6" PVC SCH 40 913.000 LF 57.40 $52,406.20 <br /> 15 Two 6" PVC SCH 40 659.000 LF 59.00 538,881.00 <br /> 16 Three 6" PVC SCH 4 327.000 LF 61.00 $19,947.00 <br /> 17 One 2" PVC SCH 40 1,477.000 LF 63.25 $93,420.25 <br /> 18 Two 2" PVC SCH 40 495.000 LF 63.25 $31,308.75 <br /> 19 Three 2" PVC SCH 4 1,397.000 LF 69.00 596,393.00 <br /> 20 Six 2" PVC SCH 40 L 1,388.000 LF 73.00 $101,324.00 <br /> 21 One 6" PVC SCH 40 720.000 LF 121.75 $87,660.00 <br /> 22 Two 4" PVC SCH 40 63.000 LF 121.75 $7,670.25 <br /> 23 Three 4" PVC SCH 215.000 LF 121.75 $26,176.25 <br /> 24 Six 4" PVC SCH 40 351.000 LF 151.00 $53,001.00 <br /> 25 One 2" PVC SCH 40 129.000 LF 92.50 $11,932.50 <br /> 26 Install Feeder Splice 11.000 EA 2,375.00 $26,125.00 <br /> 27 Install Concrete Pad 4.000 EA 2,350.00 $9,400.00 <br /> 28 Install 50" Splice Box 20.000 EA 1,775.00 $35,500.00 <br /> 29 Install 48" Handhole 2.000 EA 1,190.00 $2,380.00 <br /> 30 Install 30" Handhole 2.000 EA 601.00 $1,202.00 <br /> 31 Install 24" Handhole 18.000 EA 600.00 $10,800.00 <br /> 32 Install 12'x8' Manhole 1.000 EA 8,885.00 $8,885.00 <br /> 33 Set Concrete Pad for 40.000 EA 785.00 $31,400.00 <br /> 34 Two 4" PVC SCH 40 2,524.000 LF 39.50 $99,698.00 <br /> 35 Three 4" PVC SCH 4 4,532.000 LF 41.30 $187,171.60 <br /> 36 Five 4" PVC SCH 40 1,181.000 LF 44.80 $52,908.80 <br /> Danella Utility Construction Inc. <br />