My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 00700 - General conditions
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 00700 - General conditions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:55:02 PM
Creation date
1/25/2016 4:54:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />00700 - 11/38 <br /> <br />Documents. The CONTRACTOR shall be responsible for the means, methods, <br />techniques, sequences, and procedures of construction and safety precautions <br />and programs incidental thereto. The CONTRACTOR shall be responsible to <br />see that the finished Work complies accurately with the Contract Documents. <br /> <br />B. The CONTRACTOR shall designate in writing and keep on the Work site at all <br />times during its progress a technically qualified, superintendent, who shall not be <br />replaced without written notice to the OWNER and the ENGINEER. The <br />superintendent will be the CONTRACTOR's representative at the site and shall <br />have authority to act on behalf of the CONTRACTOR. All communications given <br />to the superintendent shall be as binding as if given to the CONTRACTOR. The <br />CONTRACTOR shall issue all its communications to the OWNER through the <br />ENGINEER. <br /> <br />C. The CONTRACTOR's supervisor or superintendent shall be present at the site of <br />the Work at all times while Work is in progress. Failure to observe this <br />requirement shall be considered as suspension of the Work by the <br />CONTRACTOR until such time as such supervisor or superintendent is again <br />present at the site. <br /> <br />6.2 LABOR, MATERIALS, AND EQUIPMENT <br /> <br />A. The CONTRACTOR shall provide competent, suitably qualified personnel to <br />survey and lay out the Work and perform construction as required by the <br />Contract Documents. The CONTRACTOR shall furnish, erect, maintain, and <br />remove the construction plant and any temporary works as may be required. <br />The CONTRACTOR shall at all times maintain good discipline and order at the <br />site. Except in connection with the safety or protection of persons or the Work or <br />property at the site or adjacent thereto, and except as otherwise indicated in the <br />Contract Documents, all Work at the site shall be performed during regular <br />working hours, and the CONTRACTOR will not permit overtime Work or the <br />performance of Work on Saturday, Sunday, or any legal holiday without the <br />OWNER's written consent given after prior written notice to the ENGINEER. <br /> <br />B. Except as otherwise provided in this Paragraph, the CONTRACTOR shall <br />receive no additional compensation for overtime Work, i.e., Work in excess of <br />eight (8) hours in any one calendar day or forty (40) hours in any one calendar <br />week, even though such overtime Work may be required under emergency <br />conditions and may be ordered by the ENGINEER in writing. Additional <br />compensation will be paid the CONTRACTOR for overtime Work only in the <br />event extra Work is ordered by the ENGINEER and the change order specifically <br />authorizes the use of overtime Work and then only to such extent as overtime <br />wages are regularly being paid by the CONTRACTOR for overtime Work of a <br />similar nature in the same locality. <br /> <br />C. All costs of inspection and testing performed during overtime Work by the <br />CONTRACTOR which is allowed solely for the convenience of the <br />CONTRACTOR shall be borne by the CONTRACTOR. The OWNER shall have <br />the authority to deduct the cost of all such inspection and testing from any partial <br />payments otherwise due to the CONTRACTOR. <br />
The URL can be used to link to this page
Your browser does not support the video tag.