My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 00700 - General conditions
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 00700 - General conditions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:55:02 PM
Creation date
1/25/2016 4:54:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />00700 - 15/38 <br /> <br /> <br />C. The CONTRACTOR shall designate a responsible representative at the site <br />whose duty shall be the prevention of accidents. This person shall be the <br />CONTRACTOR's superintendent unless otherwise designated in writing by the <br />CONTRACTOR to the OWNER. <br /> <br />6.11 SHOP DRAWINGS AND SAMPLES <br /> <br />A. The CONTRACTOR shall submit shop drawings and samples in accordance with <br />the provision for "Submittals" in the General Requirements. <br /> <br />6.12 CONTINUING THE WORK <br /> <br />A. The CONTRACTOR shall carry on the Work and adhere to the progress <br />schedule during all disputes or disagreements with the OWNER. No Work shall <br />be delayed or postponed pending resolution of any disputes or disagreements, <br />except as the CONTRACTOR and the OWNER may otherwise agree in writing. <br /> <br />6.13 INDEMNIFICATION <br /> <br />A. To the fullest extent permitted by Laws and Regulations, the CONTRACTOR <br />shall indemnify, defend, and hold harmless the OWNER; the CONSULTANT; and <br />their officers, directors, agents, and employees, against and from all claims and <br />liability arising under, by reason of or incidentally to the Contract or any <br />performance of the Work, but not from the sole negligence or willful misconduct <br />of the OWNER and/or the CONSULTANT. Such indemnification by the <br />CONTRACTOR shall include but not be limited to the following: <br /> <br />1. Liability or claims resulting directly or indirectly from the negligence or <br />carelessness of the CONTRACTOR, its employees, or agents in the <br />performance of the Work, or in guarding or maintaining the same, or from <br />any improper materials, implements, or appliances used in its <br />construction, or by or on account of any act or omission of the <br />CONTRACTOR, its employees, or agents; <br /> <br />2. Liability or claims arising directly or indirectly from bodily injury, <br />occupational sickness or disease, or death of the CONTRACTOR's or <br />Subcontractor's own employees engaged in the Work resulting in actions <br />brought by or on behalf of such employees against the OWNER and/or <br />the CONSULTANT; <br /> <br />3. Liability or claims arising directly or indirectly from or based on the <br />violation of any law, ordinance, regulation, order, or decree, whether by <br />the CONTRACTOR, its employees, or agents; <br /> <br />4. Liability or claims arising directly or indirectly from the use or manufacture <br />by the CONTRACTOR, its employees, or agents in the performance of <br />this Contract of any copyrighted or uncopyrighted composition, secret <br />process, patented or unpatented invention, article, or appliance, unless <br />otherwise specifically stipulated in this Contract; <br />
The URL can be used to link to this page
Your browser does not support the video tag.