My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 00700 - General conditions
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 00700 - General conditions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:55:02 PM
Creation date
1/25/2016 4:54:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />00700 - 21/38 <br /> <br />D. The ENGINEER will not be responsible for the acts or omissions of the <br />CONTRACTOR nor of any subcontractor, supplier, or any other person or <br />organization performing any of the Work. <br /> <br /> <br />ARTICLE 10 -- CHANGES IN THE WORK <br /> <br />10.1 GENERAL <br /> <br />A. Without invalidating the Agreement and without notice to any surety, the OWNER <br />may at any time or from time to time, order additions, deletions, or revisions in <br />the Work; these will be authorized by a written Field Order and/or a Change <br />Order issued by the ENGINEER. Upon receipt of any such document, the <br />CONTRACTOR shall promptly proceed with the Work involved which will be <br />performed under the applicable conditions of the Contract Documents. <br /> <br />B. If the OWNER and the CONTRACTOR are unable to agree as to the extent, if <br />any, of an increase or decrease in the Contract Price or an extension or <br />shortening of the Contract Time that should be allowed as a result of a Field <br />Order, a claim may be made therefor as provided in Articles 11 or 12. <br /> <br />C. The CONTRACTOR shall not be entitled to an increase in the Contract Price nor <br />an extension of the Contract Time with respect to any Work performed that is not <br />required by the Contract Documents as amended, modified, supplemented by <br />Change Order, except in the case of an emergency and except in the case of <br />uncovering Work as provided in Paragraph 13.3G. <br /> <br />D. The OWNER and the CONTRACTOR shall execute appropriate Change Orders <br />covering: <br /> <br />1. changes in the Work which are ordered by the OWNER pursuant to <br />Paragraph 10.1A; <br /> <br />2. changes required because of acceptance of defective Work under <br />Paragraph 13.7; <br /> <br />3. changes in the Contract Price or Contract Time which are agreed to by <br />the parties; or <br /> <br />4. any other changes agreed to by the parties. <br /> <br />E. If notice of any change is required by the provisions of any Bond to be given to a <br />surety, the giving of any such notice will be the CONTRACTOR's responsibility, <br />and the amount of each applicable Bond shall be adjusted accordingly. <br /> <br />10.2 ALLOWABLE QUANTITY VARIATIONS <br /> <br />A. In the event of an increase or decrease in bid item quantity of a unit price <br />contract, the total amount of Work actually done or materials or equipment <br />furnished shall be paid for according to the unit price established for such Work <br />under the Contract Documents, wherever such unit price has been established;