Laserfiche WebLink
<br />00700 - 3/38 <br /> <br />charts, instructions, and diagrams to illustrate material or equipment for some portion of the <br />Work. <br /> <br />Specifications - (Same definition as for Technical Specifications hereinafter). <br /> <br />Subcontractor - An individual, firm, or corporation having a direct contract with the <br />CONTRACTOR or with any other Subcontractor for the performance of a part of the Work at the <br />site. <br /> <br />Substantial Completion - Refers to the date certified by the ENGINEER to when all conditions <br />and requirements of permits and regulatory agencies have been satisfied, and when the Work <br />has progressed to the point where, in the opinion of the ENGINEER, as evidenced by the <br />Certificate of Substantial Completion/Notice of Completion as applicable, it is sufficiently <br />complete, in accordance with the Contract Documents, so that the Work is available for <br />beneficial occupancy and can be utilized for the purposes for which it is intended; or if there be <br />no such certificate issued when final payment is due in accordance with Article 14, Paragraph <br />14.8. A Temporary Certificate of Occupancy or Certificate of Occupancy must be issued for <br />Substantial Completion to be achieved, however, the issuance of a Temporary Certificate of <br />Occupancy or Certificate of Occupancy or the date thereof are not to be determinative of the <br />achievement or date of Substantial Completion. The terms "substantially complete" and <br />"substantially completed" can be used interchangeably as applied to any Work refer to as <br />“substantial completion” thereof. <br /> <br />Supplementary General Conditions - The part of the Contract Documents which make additions, <br />deletions, or revisions to these General Conditions. <br /> <br />Supplier - A manufacturer, fabricator, supplier, distributor, material man, or vendor. <br /> <br />Technical Specifications - Those portions of the Contract Documents consisting of the General <br />Requirements and written technical descriptions of products and execution of the Work. <br /> <br />Underground Utilities - All pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, <br />tunnels, or other such facilities or attachments, and any encasements containing such facilities <br />which have been installed underground to furnish any of the following services or materials: <br />water, sewage and drainage removal, electricity, gases, steam, liquid petroleum products, <br />telephone or other communications, cable television, traffic, or other control systems. <br /> <br />Weather Delays - Work stoppage caused by abnormal inclement weather, where abnormal <br />duration and frequency of rain as compared with the Weather Bureau data and supported by <br />project logs, has caused the contractor to suspend critical path activities during the exceptional <br />adverse weather event for more than fifty percent (50%) of the work period of the day <br />exceptionally adverse weather. Weather delay claim can be made for work day only. No time <br />extension will be allowed for weekend rains. <br /> <br />Work - All matters and things whether completed or partially completed, and includes all other <br />labor, materials, equipment and services provided or to be provided by the Successful Bidder in <br />accordance with the Contract. <br /> <br /> <br /> <br />