My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 00700 - General conditions
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 00700 - General conditions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:55:02 PM
Creation date
1/25/2016 4:54:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />00700 - 6/38 <br /> <br />9. Technical Specifications <br />10. Referenced Standard Specifications <br />11. Drawings <br /> <br />B. With reference to the Drawings the order of precedence is as follows: <br /> <br />1. Figures govern over scaled dimensions <br />2. Detail drawings govern over general drawings <br />3. Addenda/change order drawings govern over Contract Drawings <br />4. Contract Drawings govern over standard drawings <br /> <br />3.3 AMENDING AND SUPPLEMENTING CONTRACT DOCUMENTS <br /> <br />A. The Contract Documents may be amended to provide for additions, deletions, <br />and revisions in the Work or to modify the terms and conditions thereof by a <br />Change Order (pursuant to Article 10). <br /> <br />3.4 REUSE OF DOCUMENTS <br /> <br />A. Neither the CONTRACTOR, nor any Subcontractor or Supplier, nor any other <br />person or organization performing any of the Work under a contract with the <br />OWNER shall have or acquire any title to or ownership rights in any of the <br />Drawings, Technical Specifications, or other documents used on the Work, and <br />they shall not reuse any of them on the extensions of the Project or any other <br />project without written consent. <br /> <br /> <br />ARTICLE 4 -- AVAILABILITY OF LANDS; PHYSICAL CONDITIONS; REFERENCE POINTS <br /> <br />4.1 AVAILABILITY OF LANDS <br /> <br />A. The OWNER shall furnish, as indicated in the Contract Documents, the lands <br />upon which the Work is to be performed, rights-of-way and easements for access <br />thereto, and such other lands which are designated for the use of the <br />CONTRACTOR. Easements for permanent structures or permanent changes in <br />existing facilities will be obtained and paid for by the OWNER, unless otherwise <br />provided in the Contract Documents. Nothing contained in the Contract <br />Documents shall be interpreted as giving the CONTRACTOR exclusive <br />occupancy of the lands or rights-of-way provided. The CONTRACTOR shall <br />provide for all additional lands and access thereto that may be required for <br />temporary construction facilities or storage of materials and equipment; provided, <br />that the CONTRACTOR shall not enter upon nor use any property not under the <br />control of the OWNER until a written temporary construction easement <br />agreement has been executed by the CONTRACTOR and the property owner, <br />and a copy of said easement furnished to the ENGINEER prior to said use; and, <br />neither the OWNER nor the ENGINEER shall be liable for any claims or <br />damages resulting from the CONTRACTOR's unauthorized trespass or use of <br />any such properties. <br /> <br />4.2 DIFFERING SITE CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.