Laserfiche WebLink
<br />00800 - 13/13 <br /> <br /> <br /> <br />SGC-16.6 SALVAGE <br /> <br />A. Any existing equipment or material, including but not limited to: valves, pipes, fittings, <br />couplings, etc., which is removed as a result of construction under this project may be <br />designated to the OWNER at a location directed by the ENGINEER. Any equipment or <br />material not worth of salvaging shall be disposed of by the CONTRACTOR in a sound <br />environmental manner in an approved final disposal site. <br /> <br />SGC-16.7 LIMITATIONS OF OPERATION <br /> <br />A. The CONTRACTOR shall, at all times, conduct the Work in such a manner and in such <br />sequence as will ensure the least practicable interference. The ENGINEER may require <br />the CONTRACTOR to finish a section on which Work is in progress before Work is <br />started on any additional section. <br /> <br /> <br /> <br />SGC-16.8 ITEMS SPECIFIED ON DRAWINGS <br /> <br />A. Items of material, equipment, machinery and the like may be specified on the Drawings <br />and not in the Specifications. Such items shall be provided by the CONTRACTOR in <br />accordance with the specifications on the Drawings. <br /> <br /> <br /> - END OF SECTION -