My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 01044- Operations in Roadway ROW
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 01044- Operations in Roadway ROW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:55:45 PM
Creation date
1/25/2016 4:55:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />01044 - 1/1 <br />SECTION 01044 OPERATIONS IN ROADWAY RIGHT-OF-WAY <br /> <br />PART 1 - GENERAL <br />1.1 GENERAL <br />A. CONTRACTOR shall obtain all necessary permits not obtained by ENGINEER, <br />and arrange all inspection required by the State, City, and County, and shall pay <br />all charges. He/she shall conform to all applicable Florida Department of <br />Transportation, Miami-Dade County, and City of Sunny Isles Beach rules and <br />regulations. <br />B. Portions of the Standard Specifications for Road and Bridge Construction of the <br />Florida Department of Transportation, latest edition, and Supplement thereto <br />hereinafter referred to as the FDOT Specifications, are referred to and amended, <br />in part, and the same hereby made a part of this CONTRACT to the extent of such <br />references and shall be binding upon the CONTRACTOR. <br />C. Traffic flow shall be maintained in all areas of the work. <br />D. The CONTRACTOR shall take all means necessary to prevent accidents. <br />Sufficient flagmen, barricades, lights, signs and all other precautions necessary <br />shall be furnished to provide safe conditions. <br />E. Pavement: Replace damaged or destroyed street pavement, base, and subgrade <br />in complete accordance with the requirements of the controlling authority and the <br />Contract Documents. <br />F. Refer to Section 01570 for Traffic Control Requirements. <br /> <br />PART 2 - PRODUCTS (NOT USED) <br />PART 3 - EXECUTION (NOT USED) <br /> <br />END OF SECTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.