Laserfiche WebLink
<br />01630 - 2/2 <br />4. The Contractor waives all claims for additional costs related to substitution that <br />subsequently becomes apparent. <br />5. Cost data is complete and includes all related costs under the contract. <br />1.03 ENGINEER'S REVIEW: The Engineer, in evaluating the request for substitution, will <br />consider all variations of the proposed substitute from that specified to determine the <br />acceptability of the proposal. The Engineer may require the Contractor to furnish <br />additional data about the proposed substitute necessary to make such a determination. <br />The Engineer will be the sole judge of acceptability, and no substitute will be ordered or <br />installed without the Engineer's prior written acceptance. The City may require the <br />Contractor to furnish, at the Contractor's expense, a special performance guarantee or <br />other surety with respect to any substitute. Substitutions will not be considered if: <br />A. Substitutions are indicated or implied on shop drawings or product data submittals <br />without a request submitted in accordance with this section. <br />B. Acceptance will require substantial revision to the Contract Documents. <br /> <br />END OF SECTION <br />