My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 01730- Operation and Maint Info
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 01730- Operation and Maint Info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:57:27 PM
Creation date
1/25/2016 4:57:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />01730 - 3/3 <br />3. Personnel Training Requirements: Provide information available from the <br />manufacturers to use in training designated personnel to operate and maintain <br />the equipment and systems properly. <br />4. Testing Equipment and Special Tool Information: Provide information on test <br />equipment required to perform specified tests and on special tools needed for <br />the operation, maintenance, and repair of components. <br />1.03 TRANSMITTAL PROCEDURE: <br />A. Unless otherwise specified, O&M manuals, information, and data shall be transmitted <br />in accordance with SECTION 01300. Only complete sets of O&M instructions will be <br />reviewed for acceptance. <br />B. Three copies of the specified O&M information shall be provided. For ease of <br />identification, each manufacturer's brochure and manual shall be appropriately <br />labeled with the equipment name and equipment numbers it appears in the project <br />manual. The information shall be organized in the binders in numerical order by the <br />equipment numbers assigned in the project manual. The binders shall be provided <br />with a table of contents and tab sheets to permit easy location of desired information. <br />Binders shall be 3-inch, D-ring, presentation type with locking mechanism and clear <br />view vinyl cover for insertion of graphic identifying contents of binder. <br />C. If manufacturers' standard brochures and manuals are used to describe O&M <br />procedures, such brochures and manuals shall be modified to reflect only the model <br />or series of equipment used on this project. Extraneous material shall be crossed <br />out neatly or otherwise annotated or eliminated. <br />1.04 PAYMENT: <br />A. Acceptable O&M information for the project must be delivered to the Engineer prior <br />to the project being 85 percent complete. Progress payments for work in excess of <br />85 percent completion may be reduced until the specified acceptable O&M <br />information has been delivered to the Engineer. <br />1.05 FIELD CHANGES: <br />A. Following the acceptable installation and operation of an equipment item, the item's <br />instructions and procedures shall be modified and supplemented by the Contractor to <br />reflect any field changes or information requiring field date. <br /> <br />END OF SECTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.