Laserfiche WebLink
<br />02741 - 2/2 <br />3.03 APPLICATION OF PRIME COAT <br />A. After the base has been finished, the full width of surface shall be swept with a power <br />broom supplemented with hand brooms and mechanical blowers prior to the <br />application of the prime coat. Care shall be taken to remove all loose dust, dirt and <br />objectionable matter. If deemed necessary, the base shall be lightly sprinkled with <br />water immediately in advance of the prime coat. The prime coat shall be applied to <br />the full width of the base. <br />B. The temperature of the prime material shall be such as to insure uniform distribution. <br />The material shall be applied with a pressure distributor as specified above. The <br />amount to be applied shall be sufficient to coat the surface thoroughly and uniformly <br />without any excess to form pools or to flow off the base. For limerock base, the rate <br />of application shall not be less than 0.10 gallons per square yard. <br />C. If the roadway is to be opened for use following the application of the prime material, <br />a light uniform application of clean sand shall be applied and rolled. The sand shall <br />be nonplastic, shall be free from silt and rock particles and shall not contain any <br />sticks, vegetation, grass, roots or organic matter. After the sand covering has been <br />applied, the surface may be opened to traffic. <br />3.04 APPLICATION OF TACK COAT <br />A. In general, a tack coat will not be used on primed bases except in areas which have <br />become excessively dirty and cannot be cleaned or where the prime has cured and <br />lost all of its bonding effect. <br />B. No tack coat shall be applied until the primed base or leveling course or new or <br />existing asphaltic concrete has been cleaned and is free from sand, dust or other <br />objectionable material. <br />C. The tack coat shall be applied with a pressure distributor as specified above. It shall <br />be heated to a suitable consistency and applied in a thin uniform layer at the rate of <br />between 0.05 gallons and 0.15 gallons per square yard. <br />D. The tack coat shall be applied sufficiently in advance of the laying of the wearing <br />surface to permit drying, but shall not be applied so far in advance or over such an <br />area as to lose its adhesiveness as a result of being covered with dust or other <br />foreign material. The tack coat shall not advance ahead of the paving by more than <br />300 feet in business or residential areas unless otherwise approved by the Engineer. <br />Suitable precautions shall be taken by the Contractor to protect the surface while the <br />tack coat is drying and until the wearing surface is applied. <br />END OF SECTION