Laserfiche WebLink
<br />02932 - 3/3 <br />3.02 SOD HANDLING AND INSTALLATION <br />A. During delivery, prior to planting, and during the planting of the lawn areas, the sod <br />panels shall at all times be protected from excessive drying and unnecessary <br />exposure of the roots to the sun. All sod shall be stacked during construction and <br />planting so as not to be damaged by sweating or excessive heat and moisture. <br />B. After completion of soil conditioning as specified above, sod panels shall be laid <br />tightly together so as to make a solid sodded lawn area. There shall be no overlap of <br />butts or sides. On mounds and other slopes, the long dimension of the sod shall be <br />laid parallel to the contour of the slope. Immediately following sod laying the lawn <br />areas shall be rolled with a lawn roller customarily used for such purposes, and then <br />thoroughly watered. <br />C. No sod which has been cut for more than 72 hours shall be used unless specifically <br />authorized by the ENGINEER after ENGINEER'S inspection. Any sod which is not <br />planted within 24 hours after cutting shall be stacked in an approved manner and <br />maintained properly moistened. <br />D. Bring the sod edge in a neat, clean manner to the edge of all paving and shrub <br />areas. Top dressing with approved, clean, weed free, sand may be required at no <br />additional cost to the OWNER if deemed necessary by the ENGINEER. <br />E. Sodding shall not be performed when weather and soil conditions are, in the <br />ENGINEER'S opinion, unsuitable for proper results. <br />F. Areas on which sod is to be placed shall contain sufficient moisture to prevent drying <br />out. CONTRACTOR shall keep sod moist to the full depth of the rooting zone for a <br />minimum of two (2) weeks after installation. <br />3.03 MAINTENANCE <br />A. The CONTRACTOR shall produce a dense, well established lawn. The <br />CONTRACTOR shall be responsible for the repair and resodding of all eroded or <br />bare spots until project acceptance. Repair sodding shall be accomplished as in the <br />original work except that fertilizing may be omitted. <br />B. Sufficient watering shall be done by the CONTRACTOR to maintain adequate <br />moisture for optimum development of the lawn areas. Sodded areas shall receive no <br />less than 1.5 inches of water per week. <br />3.04 REPAIRS TO LAWN AREAS DISTURBED BY CONTRACTOR'S OPERATIONS <br />A. Lawn areas planted under this Contract and lawn areas outside the designated areas <br />damaged by CONTRACTOR's operations shall be repaired at once by proper sod <br />bed preparation, fertilizing and resodding, in accordance with these specifications, <br />except that for lawn areas in existence at the time of construction shall be resodded <br />with the type of sod originally in existence. <br />END OF SECTION