My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 15080- Horizontal Directional Drilling
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 15080- Horizontal Directional Drilling
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:59:43 PM
Creation date
1/25/2016 4:59:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />15080 - 3/10 <br />B. Pipe and appurtenances shall be unloaded opposite to or as close to the place <br />where they are to be laid as is practical to avoid unnecessary handling. Interiors shall <br />be kept completely free from dirt, water and foreign matter. <br />C. The CONTRACTOR shall be responsible for the proper support of the piping to <br />ensure that the pipe is not overstressed or damaged. <br />D. If applicable, the CONTRACTOR shall submit to the City two additional transition <br />couplings as spare parts, of the same type and specifications as the ones used to <br />connect the directional drilled HDPE and the proposed DIP pipe. Transition <br />couplings shall be delivered to the City’s Maintenance facility or as instructed by the <br />City, and shall include all the necessary appurtenances to make two complete <br />transitions from HDPE to DIP pipe. <br /> <br />PART 2 - PRODUCTS <br />2.01 MATERIALS <br />A. The material standards are to be interpreted as the minimum in place standards. Use <br />materials that are appropriate for the stresses generated by the selected equipment <br />and field conditions. <br />B. The CONTRACTOR shall ensure that the appropriate material is used to retain <br />compliance once it is installed. <br />C. Refer to applicable Sections of this Specifications for detailed pipe material <br />Specifications. <br /> <br />2.02 GENERAL EQUIPMENT <br />A. The directional drilling equipment shall consist of a directional drilling rig of sufficient <br />capacity to perform the bore and pullback the pipe, a drilling fluid mixing, delivery <br />and recovery system of sufficient capacity to successfully complete the crossing, a <br />drilling fluid recycling system to remove solids from the drilling fluid so that the fluid <br />can be re-used, a guidance system to accurately guide boring operations, a vacuum <br />truck of sufficient capacity to handle the drilling fluid volume, trained and competent <br />personnel to operate the system. All equipment shall be in good, safe operating <br />condition with sufficient supplies, materials and spare parts on hand to maintain the <br />system in good working order for the duration of this project. <br />2.03 DRILLING SYSTEM <br />A. Drilling Rig: The directional drilling machine shall consist of a hydraulically powered <br />system to rotate, push and pull hollow drill pipe into the ground at a variable angle <br />while delivering a pressurized fluid mixture to a guidable drill (bore) head. The <br />machine shall be anchored to the ground to withstand the pulling, pushing and <br />rotating pressure required to complete the crossing. The hydraulic power system <br />shall be self-contained with sufficient pressure and volume to power drilling <br />operations. Hydraulic system shall be free of leaks. Rig shall have a system to <br />monitor and record maximum pull-back pressure during pull-back operations. The <br />rig shall be grounded during drilling and pull-back operations. There shall be a
The URL can be used to link to this page
Your browser does not support the video tag.