My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 16132 Precast Manhole
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 16132 Precast Manhole
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:59:50 PM
Creation date
1/25/2016 4:59:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Unless otherwise provided, bracing, sheathing, or shoring involved in the <br />construction of this item shall be removed by the Contractor after the <br />completion of the manhole. Removal shall be effected in a manner which <br />will not disturb or mar finished masonry. The cost of removal shall be <br />included in the unit price bid for the structure. <br />E. After each excavation is completed, the Contractor shall notify the <br />Engineer to that effect and the manhole shall be placed after the Engineer <br />has approved the depth of the excavation and the character of the <br />foundation material. <br />3.02 BACKFILLING <br />A. After installation of manhole has been completed, that area around it shall <br />be filled with approved material, in horizontal layers and compacted to the <br />density required. The top of the fill shall meet the elevation shown on the <br />plans or as directed by the Engineer. <br /> <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.