Laserfiche WebLink
ARTICLE 12. CONFORMANCE TO DRAWINGS <br /> During the Work, Contractor shall conform in all aspects with any Drawings and furnish such <br /> information as is required to correctly and accurately reflect any changes and/or deviations made <br /> by Contractor during construction to reflect the Work as it was actually constructed. <br /> ARTICLE 13. CLEANING UP—THE CITY'S RIGHT TO CLEAN UP <br /> Contractor shall at all times keep the Project and the Project site free from accumulation of <br /> waste materials or rubbish caused by its operations. At the completion of the Project, <br /> Contractor shall remove all its waste materials and rubbish from and about the Project and the <br /> Project site as well as its tools, construction equipment, machinery and surplus materials. If <br /> Contractor fails to clean up during the prosecution of the Work or at the completion of the <br /> Project, the City may do so and the cost thereof shall be charged to Contractor. Cleaning <br /> operations should be controlled to limit dust and other particles adhering to existing surfaces. <br /> ARTICLE 14. REMOVAL OF EQUIPMENT <br /> In case of termination of this Agreement before completion for any cause whatsoever, <br /> Contractor, if notified to do so by the City, shall promptly remove any part or all of Contractor's <br /> equipment and supplies from the property of the City. If the Contractor fails to comply with the <br /> City's order, the City shall have the right to remove such equipment and supplies at the expense <br /> of Contractor. <br /> ARTICLE 15. CONTRACT DOCUMENTS <br /> The Contract Documents shall consist of this Agreement, Request for Proposal No. 14-09-01, any <br /> Addenda to the Request for Proposal, the Contractor's response to the Request for Proposal, <br /> Drawings, the Bid Bond, the Payment and Performance Bond, Contractor's Schedule of Value, <br /> approved written interpretations and clarifications, Field Directives, Construction Change <br /> Directives, any Change Orders issued thereto, and any modifications, duly issued after execution <br /> of the Agreement. Any modification to this Agreement shall only be effective if it is reduced to <br /> writing, and duly executed by both parties, except a Field Directive or Constructive Change <br /> Directive shall be effective after approval and execution by the City. The general intent of the <br /> Contract Documents is to include all items necessary for the proper execution and completion <br /> of the Project by the Contractor. <br /> ARTICLE 16. SITE INVESTIGATION AND REPRESENTATION <br /> 16.1 The Contractor acknowledges that it has satisfied itself as to the nature and location of <br /> the Work, the general and local conditions, particularly those bearing upon availability of <br /> transportation, disposal, handling and storage of materials, availability of labor, water, electric <br /> power, and roads, the conformation and conditions at the ground and all other matters which can <br /> in any way affect the Work or the Contract Amount. <br /> 16.2 The Contractor further acknowledges that it has satisfied itself as to the character, <br /> ..,.) I1 <br />