Reso 2015-2491
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2015
>
Reso 2015-2491
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2016 2:25:13 PM
Creation date
1/28/2016 10:30:00 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2015-2491
Date (mm/dd/yyyy)
11/19/2015
Description
Awd Bid 14-09-01&Agmt w/Ebsary to Construct Ped/Emergency Bridge
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor Project Manager means the person designated by Contractor as its lead <br /> representative to the City. The Contractor Project Manager shall have the authority to obligate and <br /> bind the Contractor and to act on all matters on behalf of Contractor except for revisions to the <br /> Contract Documents and Change Orders. <br /> Construction Change Order means a written directive to effect changes to the Work, prepared <br /> by and executed by the City and Contractor. <br /> Construction Work means all Work required by this Agreement for the construction of the <br /> Project. The Construction Work is also referred to herein as the "Work". <br /> Cure means the action taken by the Contractor, promptly after receipt of written notice from the <br /> City of a breach of the Agreement, which shall be performed at no cost to the City, to repair, <br /> replace, correct, and/or remedy all material, equipment, or other elements of the Work or the <br /> Agreement affected by such breach, or to otherwise make good and eliminate such breach, <br /> including, without limitation, repairing, replacing or correcting any portion of the Work or the <br /> Project site disturbed in performing such cure. <br /> Cure Period means a period of thirty(30)days, after receipt of written notice to cure from the City, <br /> in which the Contractor is required to cure deficiencies in the Work or compliance with this <br /> Agreement or the Contract Documents. <br /> Drawings means the graphic and pictorial portions of the Work, which serve to show the <br /> design, location and dimensions of the Work to be performed, including, without limitation, all <br /> notes, schedules and legends on such Drawings. <br /> Field Directive means a written approval for the Contractor to proceed with Work requested by <br /> the City, which is minor in nature and should not involve additional cost. <br /> Final Completion means the date subsequent to the date of Substantial Completion at which time <br /> the Contractor has completed all the Work in accordance with the Agreement as certified by the <br /> City and submitted all documentation required by the Agreement. Final Completion shall be <br /> evidenced by the City's issuance of a Final Certificate for Payment. <br /> Insurance Requirements means the requirements described in this Agreement and the Contract <br /> Documents. <br /> Notice To Proceed means a written letter or directive issued by the City Manager or his designee <br /> directing that the Contractor may begin Work on the Project or a specific task of the Project. <br /> Project Manager means an employee or representative of the City assigned to manage and monitor <br /> the Work to be performed under this Agreement and the construction of the Project. <br /> Project means the construction and incidentals thereto, of the project entitled RFP 14-09-01 <br /> "Construction of the North Bay Road Pedestrian Emergency Bridge", as described in the Contract <br /> Documents. <br /> Project Site means the area for the proposed Project to construct a bridge connecting 172nd Street <br /> • <br />