|
`
<br /> •
<br /> ••
<br /> •
<br /> -Y \ \
<br /> •
<br /> fLVIN BRUCE, P . S . M . , Director of Surveying
<br /> construction of pump station&force main improvements associates with existing MDWASD 0372 located
<br /> at 3950 NW 213 Street in Miami-Dade County. Client: Millian,Swain &Associates, Inc.,Julio Menache,
<br /> (305)441-0123,2007-2010.
<br /> • Professional Surveying, Topographic and Mapping Services, Miami-Dade County, FL - Project Manager
<br /> responsible for performing professional surveying, topographical and mapping services on a city-wide
<br /> basis for various city projects. Basic services include boundary surveys, right-of-way surveys, legal
<br /> descriptions,construction layout surveys, control surveys, hydrographic surveys,mean water line surveys,
<br /> topographic surveys and specific purpose surveys. Client: City of Miami Beach, Richard Saltrick, (305)
<br /> 673-7000 ext.6565,2007-2009.
<br /> • Professional Surveying Services,Broward County,FL-Project consisting of full design survey of 25 miles of
<br /> secondary canals resulting in the preparation of Right of Way Maps. The following canals are: N-30, N-
<br /> 3OA, N-23, N-17, N-12,N-8, N-4, N-5, N-5A, N-11,S-14, S-2,CC-9A, S-15, S-8,S-9,5-10,S-30, S-25,
<br /> S-24, S-22. Client: Central Broward Water Control District, Michael Crowley, (954) 432-5100, 2006-
<br /> 2011.
<br /> • City of Miami Streetcar,Miami-Dade County, FL- Survey of various roadways along the streetcar corridor
<br /> along the east-west loop and the north-south loop.Both loops are comprised of approximately 10 miles in
<br /> length of roadway.Client City of Miami,Leo Villalobos,(305)416-1280,2007-2009.
<br /> • MDX General Engineering Consultant Services - GEC A, Miami-Dade County,Fl.-Survey Project Manager
<br /> responsible for surveying and mapping services under a contract that requires multiple task orders or
<br /> authorizations to perform throughout Miami-Dade County. Client: HNTB, Jose de Almagro, P-E., (305)
<br /> 551-8100.
<br /> • General Land and Engineering Surveying Professional Services, Miami Dade County, FL- Project involved
<br /> High Accuracy,Second Order Class II,Survey for Metro Mover throughout the downtown area of the City of
<br /> Miami to include Right of Way Mapping, topographic survey and ultimately construction layout and As-
<br /> Built.Client:Miami-Dade County Public Works Department,Leo Ona,(305)375-1909,2006-2008.
<br /> • City of Sweetwater, Miami-Dade County, FL - Surveyor and Mapper for project consisting of full design
<br /> survey of miscellaneous projects throughout the City of Sweetwater limits to assist FDOT -District Six in
<br /> completing planned projects.Client:FDOT District Six,Ana Arvelo,P.E,(305)470-5210,2005-2007.
<br /> INTERCHANGE
<br /> • S.R.826(Palmetto Expressway) Interchange at Miller Drive,State Road 874 and Bird Road, Miami Dade
<br /> County, FL - Project consisting of sectional survey, control survey, drainage and utility survey, Project
<br /> Network Control Survey, location of soil borings,full digital terrain modeling,and preparation of Right of
<br /> Way Map all tied into Florida State Plane Coordinate System North American Datum 1983/90
<br /> readjustment and National Geodetic Vertical Datum of 1929 (NGVD 29).Client FDOT District Six, Jason
<br /> Chang,P.E.,(305)470-5331, 1996-2008.
<br /> • S.R. 874 Killian Parkway, Miami-Dade County, FL- Design Survey for the reconstruction of a six lane to
<br /> eight lane limited access toll plaza facility. The project includes two new mainline toll plazas,a ramp toll
<br /> plaza,and the demolition of an existing toll plaza. The new plaza provides for open road. The project also
<br /> includes improvements to Killian Parkway. Client Miami-Dade Expressway Authority,Alfred Lurigados,
<br /> P.E.(305)637-3277,2006-2008.
<br /> • 1-95 & Okeechobee Road Interchange, Palm Beach County, FL- Project consisted of the preparation of
<br /> control survey resulting in the preparation of right of way mapping.Total length of project 2 miles.
<br /> MAJOR ARTERIAL
<br /> • S.R.90/S.W.8th Street from S.R.821 (HEFT)to S.R.826(Palmetto Expressway),Miami-Dade County,FL
<br /> - Survey Project Manager for milling and resurfacing project that includes safety improvements, ADA
<br /> upgrades,and additional safety upgrades at the intersections of S.W.92nd Avenue,S.W. 102nd Avenue to
<br /> S.W.99th Place,and S.W. 109th Avenue. Furthermore, upgrades to include provisions for Turbo Lanes at
<br /> the intersection of S.W. 102nd Avenue will be made. Design elements include roadway design,signing&
<br /> ®
<br /> pavement markings, drainage, maintenance of traffic, surveying and mapping, geotechnical, landscape
<br /> architecture, bridge design,lighting,signalization and traffic engineering. Client: FDOT District Six,Ana
<br /> ♦::: Arvelo,P.E,(305)470-5210,2010-Present.
<br /> SECTION 3 • PAGE 161
<br /> CSA GroupCONFM%P60FFAUONAI AIWIRTEM a acngaas UMW RIM oar gad)
<br /> MUD Po!OIA161tAU07 NI.124442
<br />
|