|
•
<br /> •
<br /> • •
<br /> L)ARRYL J . HAUSER, P . S . M . , Right-of-Way Project
<br /> • City of Miami Civil Engineering Services for Roadway Projects, Miami-Dade County, FL - Project Surveyor
<br /> for Civil Engineering services to include complete planning, design, programming, pavement analysis,
<br /> surveying, geotechnical, options evaluations, public meetings, detailed assessments and
<br /> recommendations,cost estimation,opinions of probable construction costs, quality control reviews,field
<br /> investigations, observations, post design services,construction administration and other related services
<br /> as need to complete projects. Projects include: roadway reconstruction or resurfacing, drainage
<br /> improvements, swale restoration, curbs,gutters, sidewalks, lighting improvements, landscaping,signage
<br /> and striping, verification of City's pavement analysis report within project area, surveying, geotechnical
<br /> and utility locations.Client: City of Miami Capital Improvements,Gary Fabrikant,(305)416-1224,2008-
<br /> Present
<br /> • Center Grove Street & Lighting Improvements, Miami-Dade County, FL - Civil roadway engineering
<br /> services for the design of street improvements including repair of existing sidewalks, new sidewalks
<br /> and ADA ramps; 1419-Parking and Surcharge 2007. Services will include project management and
<br /> engineering analysis services necessary for preparing a Civil Engineering Services for the project the
<br /> area bounded by Bird Road to the north, SW 27th Avenue to the east, McDonald Street to the west,
<br /> and Oak Avenue and Tigertail Avenue to the south.The project will include decorative lighting for all
<br /> the streets within the project perimeter,perform a topographic survey and establish the existing right-
<br /> of-way of the project area to generate plans for the lighting design of all the streets within the project
<br /> area and utility coordination for project area.
<br /> • Palm Grove Roadway Improvements,Miami-Dade County,Fl.-As part of a master continuing services
<br /> agreement providing Civil Engineering Services to Roadway Projects. Services include engineering
<br /> field services, project management assistance, engineering analysis, design services on an "as
<br /> needed basis"for preparing roadway plans The project limits are bounded by NE 4th Court to the west,
<br /> ® NE 79 Street to the north, NE 58 Street to the south, and Biscayne Boulevard to the east,within the
<br /> City of Miami. Services will include engineering design,ADA improvements,surveying and mapping,
<br /> landscape architecture,geotechnical,utility coordination and public involvement.
<br /> • Central Broward Water Control District,Broward County,FL-Project consisting of full design survey of 25
<br /> miles of secondary canals resulting in the preparation of Right of Way Maps. The following canals are: N-
<br /> 30, N-30A,N-23,N-17, N-12, N-8, N-4, N-5, N-5A, N-11,S-14,S-2,CC-9A,S-15, S-8,S-9,S-10,S-30,
<br /> S-25, S-24, S-22. Client Central Broward Water Control District, Michael Crowley, (954) 432-5100,
<br /> 2006-2009
<br /> Major Arterial
<br /> • S.R.90/S.W.8th Street from S.R.821(HEFT)to S.R.826(Palmetto Expressway),Miami-Dade County,FL
<br /> -Project Surveyor for milling and resurfacing project that includes safety improvements, ADA upgrades,
<br /> and additional safety upgrades at the intersections of S.W.92nd Avenue,S.W. 102nd Avenue to S.W.99th
<br /> Place, and S.W. 109th Avenue. Furthermore, upgrades to include provisions for Turbo Lanes at the
<br /> intersection of S.W. 102nd Avenue will be made. Design elements include roadway design, signing &
<br /> pavement markings, drainage, maintenance of traffic, surveying and mapping, geotechnical, landscape
<br /> architecture,bridge design, lighting,signalization and traffic engineering.Client: Florida Department of
<br /> Transportation,Ana Arvelo,P.E,(305)470-5210,2010-Present
<br /> • S.R. 968/W. Flagler Street from NW/SW 14th Avenue to NW/SW 2nd Avenue, Miami-Dade County, FL-
<br /> Reconstruction/Resurfacing of SR 968/West Flagler Street existing curb and gutter sections, including
<br /> upgrading sidewalks and pedestrian cross-walks to ADA compliance, upgrading traffic signals, lighting
<br /> and drainage system,intersection improvements and landscaping enhancement Consul-Tech will render
<br /> roadway design, quality control, constructability reviews and surveying and mapping services. Client:
<br /> Gannett Fleming,Inc.,Pablo Bielecki,P.E.,(786)846-9540,2009-Present
<br /> • S.R.AIA(Ocean Drive)-Hallandale Beach,Florida,Broward County- Project Surveyor for RRR Milling and
<br /> resurfacing of SR A1A from south of Seacrest Parkway(MP 0.870)to Azalea Terrace(MP 2.011).Services
<br /> include roadway design,drainage,signalization,maintenance of traffic,signing and pavement markings,
<br /> ® utility coordination,landscaping,geotechnical, photogrammetry,and public involvement. Client: Florida
<br /> Department of Transportation District Four,Bing Wang,P.E., (954)777-4406,2006-2008
<br /> ♦♦♦♦ SECTION 3 • PAGE 1 65
<br /> CSA GroupCONTMINi POOFBIIONAL AMMIU FBAu 0 F W4llatN%MIMI FBM OU MTh
<br /> IffirE l FOO OOADFICAIIONI N0.12-04-02
<br />
|