My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
R.J. Behar & Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2016 4:20:03 PM
Creation date
2/1/2016 4:14:24 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SUNNY ISLES BEACH 24401117 <br /> --I r7.7;s COMM PROFESSIONAL ARCHITECTURAL&FNQEVEERENN SFRVN03 FIRMS ONLY(COLA) <br /> REQUEST FOR QIIAWITATTONS NO.12-04.02 <br /> CLIENT <br /> City of Miami BATTERSEA AND DOUGLAS ROAD DRAINAGE <br /> 444 SW 2nd Avenue, 8th Floor CITY OF MIAMI,FLORIDA <br /> Miami, Florida 33130 <br /> Mr. Jose Lagos, PE The project is located near the intersection of SW 37th Avenue (Douglas Road) <br /> Tel: (305) 416-1252 and Battersea Road within the City of Miami limits. The project area had been <br /> experiencing significant drainage problems during regular storm events. RJ <br /> RJ BEHAR'S ROLE Behar prepared a study of the area to identify alternatives for reducing the <br /> drainage problems. RJ Behar also prepared plans to improve the drainage <br /> Roadway plans, signing and marking deficiencies for the intersection with milling and resurfacing of all the areas that <br /> plans, specifications, traffic control were affected. The design included rehabilitation of existing outfalls, seawalls <br /> plans, utility coordination and drainage swale trencher, retrofit with flap gates and injection wells. <br /> improvement plans services <br /> This project included HR Engineering r.• . - • ?!34` <br /> Services, Inc. (HRES) as a sub- = I �" A '� F ••�kz`'; <br /> consultant for geotechnical services. „ fir ; i ; <br /> F3 <br /> PROJECT STARTED: 01/2005 y `� � 'S � � . '`., STo1 <br /> \ s 1. f ,_'1 tip' <br /> PROJECT COMPLETED: 09/2008 - '+ ' -� •-•` <br /> - ...�. saii i;• his r.. ... <br /> COST/FEES PAID: S80,000.00 �.1 - `_ `s <br /> CONST.COST: N/A ^"` - BATTERSEA.ROAD _- <br /> ® a - --_.: <br /> RJ BEHAR'S KEY PERSONNEL -' <br /> Robed J. Behar, PE -------L------ `�= ' 1 _ <br /> Principal in Charge -_ = -¢� <br /> e. <br /> Israel Magrisso, PE <br /> — <br /> Project Manager K:+s'•�" 5' <br /> nist <br /> Juan H. Vazquez, PE, PH, BCEE _»a ' ` .� s j +13 iv'' 'vim • �x <br /> Drainage Engineer F�`'Lig ' ' 549-3•. w r *A' Vel <br /> xt <br /> Jerry Piccolo, PE ,� ,-A, �•` ati�.k��K\'` Att <br /> Structural Design Engineer t3;t«^. .; t .w`'„ +': <br /> v. <br /> Carmen A.Aponte, MSE, CEI <br /> Drainage Engineer STORMWATER INLET LOCATED AT TH: STORMWATER INLET LOCATED ON <br /> NW CORNER OF THE INTERSECTION THE <br /> Adnana Gonzalez, El z NW SIDE OF DOUGLAS ROAD <br /> Project Engineer ; <br /> Daimian D. Leslie, El , TS = 4_. fir' - - s� <br /> Project Engineer a. , '-':. '� --t ,, ; :� <br /> c-,misail _ ma /, 111l <br /> Pedro Fiallo r - _ - -',i:' <br /> f,.' ri itl� -- S � �a � <br /> Project Engineer Structural -Px ifs = -=. ., - ° -'- <br /> • STORMWATER INLET LOCATED AT EXISTING CONDITIONS OF A TYPICAL <br /> THE INLET FOUND IN THE STUDY AREA <br /> ® EAST SIDE OF BATTERSEA ROAD <br /> R.J.Behar SECTION 2 - PAGE 117 <br /> III <br />
The URL can be used to link to this page
Your browser does not support the video tag.