Laserfiche WebLink
c <br /> CITY OF SUNNY ISLES BEACH �'. <br /> ".-7 - 'r'''t CONTINUA PROFESSIONAL ARCHITECTURAL&FN6INEERLN6 SERVICES FIRMS ONLY(CCNA) • <br /> ® REQUEST FOR QUALIFICATIONS NO.1244-02 <br /> CLIENT WATER AND SEWER IMPROVEMENTS UAZ 303 <br /> Broward County Board of <br /> Commissioners The scope of this project consisted of design and preparation of the <br /> Water and Wastewater Services construction documents for complete replacement of the water distribution <br /> Water and Wastewater Engineering system, upgrading the water transmission system and providing a new <br /> Division (BCWWS -WWED) sanitary sewer system with pump station upgrades. It also includes <br /> permitting procedures with the agencies having jurisdiction. The project <br /> Subconsultant to: includes: 413 feet of 6", 1,994 feet of 8" and 3,509 feet of 12"water mains; <br /> Chen &Associates 926 feet of 16" transmission line updating, and 3,431 feet of new sanitary <br /> 500 West Cypress Creek Road sewers. RJ Behar coordinated conflicts with the location of existing <br /> Suite 410 utilities and proposed developments. The scope of the project also <br /> Fort Lauderdale, FL 33309 included construction administration services. <br /> Peter Moore, PE <br /> Principal Engineer s ,. ri� 4 -3r sa F,, , o �. ; • <br /> Tel (954) 730-0707 Ext 110 } , 'r` .~ A'" - , <br /> Fax: (954) 730-2030 <br /> pmoorenachenandassociates.com i.. ', 'n h.., -�'`"i J4 <br /> •-b Tr- 'f;i� _` I <br /> RJ BEHAR'S ROLE i- a c f. 7 `-t A 1 j iI t <br /> 0 Water and Sewer Improvement _• '�i • ; r+ I ` {" �1.`A5 '-.1 2.44 _ j �1 ' <br /> it <br /> services r`' t . fCr-3 _;i {:. s;.�!`;3 , I` i l'�' � <br /> c1 , " '-318 1 �14Is+4 i 1.442f, I l <br /> *'. 11. x .}e s tdl '.Ie 1 s'nrsr 1 .' � 1 1 , <br /> i <br /> 7j3 <br /> PROJECT STARTED: 06/01/2008 , ' .,W yx Noli.0s- Iir�'e� rY _.I1_ ' ' <br /> LA ', <br /> PROJECT COMPLETED: 04/2012 ` tr;c r- .tJ ff" _ • '" a +� 7 �s ;V <br /> COST/FEES PAID: $333,937 �i^fa M.' ' `` I r4:""` .` f ./I$'' i• i •,t <br /> CONST.COST: S1,859,316 �.i� l' • =_ • `* 144 , Dm 5 , t_ /4% <br /> 14'� r el <br /> RJ BEHAR'S KEY PERSONNEL <br /> Robert J. Behar, PE {� %*; Iiy:49 ¢J •?, fPS.; <br /> Principal in Charge d • — _Ilrm <br /> Juan H. Vazquez, PE, PH, BCEE "-., w '9e <br /> Engineer of Record <br /> Sandra Sequeira, MS, El ` ; r r• <br /> . r: <br /> Project Engineer ; <br />