My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
R.J. Behar & Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2016 4:20:03 PM
Creation date
2/1/2016 4:14:24 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•OFESSIONAL SURVEYING SERVICES \ • <br /> Davie, Florida, Broward County CSA c .o <br /> www.csagraup.com <br /> CLIENT Central Broward Water Control District =? <br /> 8020 Sliding Road <br /> Davie, FL 33024 ICENTRAL►BRowARD,WATERXONTROL►DISTR/CT <br /> Contact _ <br /> Michael Crowley <br /> Tel (954) 432-5100 _ - _ '�r <br /> Fax (954)432-8603 , • <br /> mtcrowlev bellsouth.net <br /> • <br /> • <br /> li V <br /> SERVICES PERFORMED Performed horizontal control surveying for secondary canals in Zones <br /> 1, 2, 3, 4, 5, and 6 located at Davie, Florida to include canal banks, <br /> edge-of-water, property lines, right-of-way lines, drainage easements, <br /> maintenance easements, road and canal reservations as well as <br /> topographical features. This survey will also depict all surface utilities, <br /> structures, crossing overhead utility lines, culvert and road crossings, <br /> and encroachments, edge of pavements, guardrails, fences and <br /> vegetation areas within each canal right-of-way, easement or <br /> reservation. The result of this survey will be depicted on a right-of-way <br /> map for each canal. The combined total length for this project exceeded <br /> 24 miles. Following are the canals included in the survey: <br /> Zone 1: Canals N-30, N-30A, N-23 <br /> Zone 2-3: Canals N-17, N-12 <br /> Zone 3: Canals N-8, N-4, N-5, N-5A, N-11 <br /> Zone 4: Canals S-14, S-2, CC-9A <br /> Zone 5: Canals 8-15, S-8, S-9, 8-10 <br /> Zone 6: Canals S-30, S-25, S-24, S-22 <br /> COMPLETION DATE June 2006 — April 2009 <br /> CONSUL-TECH FEE $600,000 <br /> KEY PERSONNEL Andres Garganta, P.E., Principal-in-Charge <br /> Selvin Bruce, P.S.M., Project Manager <br /> SECTION 2-PAGE 128 <br /> (MAIM RIOF1SSMAL IROUTmI RLL i ENUMER\C SUMO minc OLLI(MN u <br /> FOP EST FOR ft WIMIWS u.1±414± <br />
The URL can be used to link to this page
Your browser does not support the video tag.