My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
R.J. Behar & Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2016 4:20:03 PM
Creation date
2/1/2016 4:14:24 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF WEST MIAMI * <br /> ®RAINAGE IMPROVEMENTS '7•• <br /> auk Group <br /> Miami, Florida, Miami-Dade County <br /> www.csagroup.com <br /> ;- x� <br /> y4 <br /> •,� t. <br /> CLIENT H. J. Ross & Associates, Inc. <br /> 201 Alhambra Circle #900 t % ., <br /> Coral Gables, FL 33134 rat fr `; ;1 e5iti1 <br /> y:.. <br /> ,i II Contact: <br /> Cesar Calas � � 1 <br /> + <br /> Alfredo Reyna a1tai <br /> Tel. (305) 567-188811111, <br /> Fax: (305) 567-1771 SI; `• 6b�n{ <br /> ccalas(@hiross.com <br /> y <br /> I Ilr �, <br /> Cnnl� - <br /> 3e ,1 <br /> SERVICES PERFORMED Consul-Tech utilized GPS to obtain State Plane Coordinates for <br /> Project and Traverse Points; set street baselines per either FDOT <br /> Right-of-Way Maps or other recorded information; Full Topographic <br /> Survey which includes: Locations of all above ground features and <br /> improvements with elevation, cross-sections to out past existing <br /> Right-Of-Way, location of important drainage features (i.e. <br /> crown/high/low point of road, ditch/swale/top of bank/flow line, etc), <br /> Complete structure data (i.e. rim elevations, invert elevations, pipe <br /> sizes, pipe types, pipe directions), report clogged and /or <br /> inaccessible structures to client. The project included approximately <br /> 14.5 miles of road within the City. <br /> COMPLETION DATE August 2002 — December 2004 <br /> CONSUL-TECH FEE $ 125,000 <br /> KEY PERSONNEL Andres Garganta, P.E., Principal-in-Charge <br /> 1 <br /> m\mincPROF}Sve\numm6lRad LUNmuNc4RUMSFUP I'u(mI) SECTION2-PAGE 130 <br /> nryim FOR 91 umum\s se.I±4142 <br />
The URL can be used to link to this page
Your browser does not support the video tag.