My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
R.J. Behar & Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2016 4:20:03 PM
Creation date
2/1/2016 4:14:24 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Related Projects / Experience <br /> Project Name: Northwest Storm Sewer Project " d <br /> Description of Work: Completion Client Name,Address,Phone Number: <br /> Year: <br /> The purpose of this roadway survey was to perform pavement thickness Reynolds, Smith and Hills <br /> measurements between NW 71st Street to NW 62nd Street and NW 7'd Chris Jackson, P.E. <br /> Avenue to NW 120'Avenue in Miami-Dade County, Florida. The data was 6161 Blue Lagoon Drive, Suite 200 <br /> used to help evaluate the existing structural conditions of the pavement Miami, Florida 33126 <br /> and prepare a milling, resurfacing and a reconstruction program for the <br /> roadway sections. In addition, soil borings were performed along the <br /> planned swales. The field exploration program consisted of the 2009 <br /> performance of 25 pavement cores for pavement thickness measurement. Professional Fees: <br /> In addition, HRES performed 22 SPT borings and 3 hand augers at the 522,685 <br /> pavement core locations as an attempt to measure the thickness of the <br /> base down to a depth of 2 feet below the bottom of the asphaltic course. <br /> Cross slope measurements (ft/6 ft)were performed for every pavement <br /> core. <br /> Design Professionals Involved with their Roles in the Project: Construction Cost: <br /> 41111 Hemando R. Ramos, P.E. N/A <br /> rahR.J.Behar SECTION 2-PAGE 34 <br /> JJ CONi1NING PROIUUONA1 AtIHITICUI I d YNEINUHRI G UBYICB RINI ONLY MIA) <br /> HUUT FOS 41Al1NIAT0N1 NO.1244-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.