My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
R.J. Behar & Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2016 4:20:03 PM
Creation date
2/1/2016 4:14:24 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUAN H. VAZQUEZ, PE, PH, BCEE <br /> Griffin Road and State Road 7—FDOT, District 4 <br /> Drainage Engineer. Prepared the MOT and drainage design concept Phase 1 report for SR 7 and prepared the drainage <br /> modifications to the Griffin Road section. Completed the drainage for SR 7 and permitting with the South Florida Water <br /> Management District (SFWMD), Broward County DNRP and US Army Corps of Engineers. Also completed plans for the <br /> relocation of a water main for Broward County Office of Environmental Services. <br /> CONSTRUCTION MANAGEMENT EXPERIENCE <br /> Principal-In-Charge, Special Inspector and Contract Manager for the South Florida Water Management District. <br /> (SFWMD)for: <br /> • S 332-D Pump Station Hardening <br /> • Deering Estates Floway <br /> • S-331 Pump Station Hardening <br /> • S-20F Wingwall Repairs <br /> • C-100 and C-2 Bank Restoration <br /> • G-420/422 and S-20F Roof Replacements <br /> C-100 and C-2 Bank Restoration—South Florida Water Management District(SFWMD) <br /> Project Manager and Special Inspector. He organized staff and performed contract management. The scope of this project <br /> entailed providing construction inspection services for canal bank restoration using gabions and rip-rap revetments. <br /> S-59, S-62 and S-63 Concrete Repairs—South Florida Water Management District(SFWMD) <br /> Task Manager. He organized staff and performed contract management. The scope of this project entailed providing <br /> construction inspection services for concrete repairs at three control structures. <br /> S-60 Gate Operational and Concrete Repairs—South Florida Water Management District(SFWMD) <br /> Task Manager. He organized staff and testing needs. The scope of this project entailed providing construction inspection <br /> services for gate replacement and concrete repairs. <br /> Compartment C Construction Inspections—South Florida Water Management District(SFWMD) <br /> Task Manager. He organized staff needs and performed contract management. The scope of this project entailed providing <br /> construction inspection services for construction of Compartment C. <br /> C-4 Cutoff Sheet Pile Wall—South Florida Water Management District(SFWMD) <br /> Project Manager and Special Inspector. He coordinated, staff, testing needs, requests for information,shop drawing reviews, <br /> and material approvals. The scope of the project consisted of providing inspection services, for the construction of a sheet pile <br /> cutoff wall and concrete cap, miscellaneous drainage, and earthwork along the north bank of the C-4 canal, from the Turnpike <br /> to 132^'Avenue in Miami-Dade County, Florida. <br /> S-65E Construction Inspection—South Florida Water Management District(SFWMD) <br /> Task Manager. He coordinated staff and testing requirements. The scope of the project involved, providing construction <br /> inspection services for S-65 E scour hole repairs and weir across the Kissimmee River. <br /> Southern CREW Imperial River Restoration, Construction Management — South Florida Water Management District. <br /> (SFWMD) <br /> Task Manager. He organized staff and coordinated testing needs. The scope of this project entailed providing construction <br /> inspection services to the Southern CREW Imperial River Restoration Project- Billy Don Grant Parcel Restoration. <br /> S-310 Clewiston Lock Structure Inspection—South Florida Water Management District(SFWMD) <br /> Task Manager for inspection of the project and provided professional recommendations as necessary. <br /> Area West of US-1 Drainage Study—City of Hallandale Beach, Florida <br /> Task Manager responsible for the inspection of this project. He provided consultation during construction, reviewed shop <br /> drawings,evaluated change orders and responded to request for information. <br /> George Washington Memorial Highway— Mt.Vernon,Virginia <br /> Inspector. The limits of the project were from Mt. Vernon to Alexandria, Virginia. He performed daily inspections of concrete <br /> pavement rehabilitation, new concrete pavement, roadway embankment, drainage installation, landscape installation and <br /> pavement markings. The pavement rehabilitation included joint sealing retrofit of joint dowels and pavement undersealing. He <br /> also verified surveys and conducted verification elevations, performed concrete cylinder testing as part of the quality <br /> assurance procedures, and inspected the maintenance of traffic features and detours. Duties included inspection and <br /> reporting,quality control,change order reviews,quantity take off and verification for payment certification. <br /> St. Joe River Road from Calder to Avery, Idaho <br /> ® Inspector. This project consisted of constructing 10 miles of a 2-lane rural roadway on an existing railroad alignment. He <br /> performed daily inspection of earthwork operations, blasting, drainage installation, construction of gabion walls along the river <br /> banks, box culverts and also inspected three new bridges. Two of the bridges used ASSHTO beams and the third was a long <br /> ® R.J.Behar CONING PROFESSIONAL SECTION 3 - PAGE j8 <br /> PROFESSIONAL AIClT[9A16 p€LhffIIYG UMW ONLY MU <br /> II _ Ira(UT FOR YWlnafON1 NIL 12-0402 <br />
The URL can be used to link to this page
Your browser does not support the video tag.