My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
R.J. Behar & Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2016 4:20:03 PM
Creation date
2/1/2016 4:14:24 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CARMEN A. APONTE, MSE, CEI <br /> Miramar Canal System Evaluation—City of Miramar, Florida <br /> Senior Drainage Designer who performed site evaluations to determine the existing conditions of the canal system. She <br /> evaluated the drainage basins, siltation and deterioration of seawalls. Ms. Aponte performed basin evaluation using the <br /> AdICPR model. She also studied the canal system interaction with the TURNPIKE/HEFT interchange drainage system. <br /> US-1/S12-5, St Lucie County, Florida—FDOT, District 4 <br /> Drainage Designer who prepared the right-of-way occupancy permitting package and NPDES- SWPPP plan preparation. <br /> Turnpike Widening Johnson Street to Griffin Road—FDOT Turnpike Enterprise <br /> Senior Drainage Designer for drainage to widen the Tumpike main line from 6 to 8-lanes. This project involved milling, <br /> resurfacing and widening of the Turnpike. Ms.Aponte worked on the drainage design and permitting packages. <br /> Hollywood Boulevard (SR•820)from SR-A1A to US 1 — FDOT, District 4 <br /> Senior Drainage Designer- Ms.Aponte worked on the design of drainage improvements for the project. <br /> ADDITIONAL TRAININGICERTIFICATIONS <br /> • FDOT District 6 training on design of French drains and injection wells using AdICPR. <br /> • 2008 AdICPR Training <br /> • 2007 Drainage Design Using ASAD <br /> • Stormwater Management Design Course—Florida Engineering Society 2003 <br /> • Use of FDOT Drainage Standards—FDOT 2003 <br /> • Culvert Hydraulics—FDOT 2003 <br /> • Groundwater Flow and Transport Modeling with GMS(MODFLOW and MODPATH) <br /> • 40 Hours HAZMAT/Health and Safety Training <br /> • ISO 14000 Audits,Auditor Training Course <br /> • EPA Certified Lead-Based Paint Risk Assessor and Inspector in Florida(FL-03-0920045002) <br /> • Certified Environmental Inspector(CEI)for Phase I and Phase II ESA(CEI 33549) <br /> R.)t.Behar SECTION 3 • PAGE 134 <br /> CONTLNELNG PROFESSIONAL ASDDittrult&Ei6LAIER NG SEEM HMS ONLY(MAI <br /> II - Rrorm Fog OLuuuAllONI NO.124442 <br />
The URL can be used to link to this page
Your browser does not support the video tag.