Laserfiche WebLink
® as ., Calvin, Giordano g Associates, Inc. <br /> LEXCIPTIONAt SOLUTIONS <br /> ® # <br /> ® <br /> Douglas Taylor, PE, Page 2 <br /> Griffin Road, FL; Project Manager, Engineer of Record. Included in this project was the milling and <br /> resurfacing of two miles of highway and the addition of two lanes of new roadway to create a four lane <br /> section. This involved the addition of drainage improvements and water quality improvements. <br /> 0 <br /> ® NW 38th Street Improvements, Oakland Park, FL - Project Manager- Mr. Taylor managed the <br /> - engineering design services for a section of roadway located west of 1-95. The design included paving,base, <br /> 0 sub-base, drainage and other utilities. This was an existing 40 year old roadway which was originally <br /> 0 designed without consideration of the drainage of areas adjacent to the roadway. This was corrected with <br /> the reconstruction. <br /> 0 Bonaventure Development District (BDD), Weston, FL. Mr. Taylor works on various design projects and <br /> ® "troubleshoots" issues related to the District. The Bonaventure Development District (BDD), formerly <br /> - known as West Lauderdale Water Control District,was first developed in the early 1970's and annexed into <br /> the City of Weston in 1997 and encompasses 1,237 acres, to include residential, a major hotel/conference <br /> ® facility,two golf courses and a limited number of commercial properties. <br /> The District's storm water management system consists of canals and lakes interconnected discharging <br /> ® into the South Florida Water Management District (SFWMD) North New River Canal (NNRC). The water <br /> quality and discharge rates are permitted to be controlled by two storm water pump stations on the <br /> northern boundary of the community. Construction of the principal Drainage Facilities began in 1970 and <br /> ® was completed in 1974. <br /> 0 <br /> ® NW 12th Street Improvements, Oakland Park, FL- Project Manager. Within the CRA redevelopment <br /> area, this narrow roadway did not meet the standards required to create an environment conducive to <br /> ® positive economic development of the area. This included widening, on street parking, and the introduction <br /> p of new landscape and hardscape elements. Services provided included the planning, design, and permitting <br /> - of roadway, drainage,utility relocation, pavement marking and striping improvements. <br /> 40 <br /> ® Cougar Lane, Coconut Creek, FL-Project Manager. Cougar Lane, adjacent to Coconut Creek High School, <br /> ® was a roadway nearing the end of its intended useful design life that was experiencing drainage problems. <br /> Services provided included the design, permitting, and construction services for milling and resurfacing of <br /> 0 the roadway, utility relocation, and drainage retrofit for one half mile of existing roadway. <br /> O <br /> - Manatee Isles Drive Roadway Project, Weston, FL, Project Engineer. This project for the City of <br /> Weston, was designed to widen and provide drainage improvements on Manatee Isles Drive between SW <br /> ® 196th Avenue and South Post Road. The project also included milling and resurfacing, median work, <br /> ® installation of curb and gutter, signing and marking upgrades, and a Maintenance of Traffic plan, in addition <br /> _ to proposed electrical, landscape and irrigation work. <br /> 0 <br /> O <br /> 0 <br /> O <br /> 0 <br /> co <br /> O <br /> O <br /> • Page 31 34 <br /> 0 <br /> 0 <br /> City of Sunny Isles Beach, Florida. Supervised the development of a base map for GIS <br /> ® by compiling all recorded plats within the City limits. <br /> 0 <br /> O' <br /> 0. Page 31 35 <br /> O <br />