|
® as ., Calvin, Giordano g Associates, Inc.
<br /> LEXCIPTIONAt SOLUTIONS
<br /> ® #
<br /> ®
<br /> Douglas Taylor, PE, Page 2
<br /> Griffin Road, FL; Project Manager, Engineer of Record. Included in this project was the milling and
<br /> resurfacing of two miles of highway and the addition of two lanes of new roadway to create a four lane
<br /> section. This involved the addition of drainage improvements and water quality improvements.
<br /> 0
<br /> ® NW 38th Street Improvements, Oakland Park, FL - Project Manager- Mr. Taylor managed the
<br /> - engineering design services for a section of roadway located west of 1-95. The design included paving,base,
<br /> 0 sub-base, drainage and other utilities. This was an existing 40 year old roadway which was originally
<br /> 0 designed without consideration of the drainage of areas adjacent to the roadway. This was corrected with
<br /> the reconstruction.
<br /> 0 Bonaventure Development District (BDD), Weston, FL. Mr. Taylor works on various design projects and
<br /> ® "troubleshoots" issues related to the District. The Bonaventure Development District (BDD), formerly
<br /> - known as West Lauderdale Water Control District,was first developed in the early 1970's and annexed into
<br /> the City of Weston in 1997 and encompasses 1,237 acres, to include residential, a major hotel/conference
<br /> ® facility,two golf courses and a limited number of commercial properties.
<br /> The District's storm water management system consists of canals and lakes interconnected discharging
<br /> ® into the South Florida Water Management District (SFWMD) North New River Canal (NNRC). The water
<br /> quality and discharge rates are permitted to be controlled by two storm water pump stations on the
<br /> northern boundary of the community. Construction of the principal Drainage Facilities began in 1970 and
<br /> ® was completed in 1974.
<br /> 0
<br /> ® NW 12th Street Improvements, Oakland Park, FL- Project Manager. Within the CRA redevelopment
<br /> area, this narrow roadway did not meet the standards required to create an environment conducive to
<br /> ® positive economic development of the area. This included widening, on street parking, and the introduction
<br /> p of new landscape and hardscape elements. Services provided included the planning, design, and permitting
<br /> - of roadway, drainage,utility relocation, pavement marking and striping improvements.
<br /> 40
<br /> ® Cougar Lane, Coconut Creek, FL-Project Manager. Cougar Lane, adjacent to Coconut Creek High School,
<br /> ® was a roadway nearing the end of its intended useful design life that was experiencing drainage problems.
<br /> Services provided included the design, permitting, and construction services for milling and resurfacing of
<br /> 0 the roadway, utility relocation, and drainage retrofit for one half mile of existing roadway.
<br /> O
<br /> - Manatee Isles Drive Roadway Project, Weston, FL, Project Engineer. This project for the City of
<br /> Weston, was designed to widen and provide drainage improvements on Manatee Isles Drive between SW
<br /> ® 196th Avenue and South Post Road. The project also included milling and resurfacing, median work,
<br /> ® installation of curb and gutter, signing and marking upgrades, and a Maintenance of Traffic plan, in addition
<br /> _ to proposed electrical, landscape and irrigation work.
<br /> 0
<br /> O
<br /> 0
<br /> O
<br /> 0
<br /> co
<br /> O
<br /> O
<br /> • Page 31 34
<br /> 0
<br /> 0
<br /> City of Sunny Isles Beach, Florida. Supervised the development of a base map for GIS
<br /> ® by compiling all recorded plats within the City limits.
<br /> 0
<br /> O'
<br /> 0. Page 31 35
<br /> O
<br />
|