<br /> ® Our water experience includes the design and permitting of new water distribution networks, water
<br /> • distribution system replacements and upgrades, and booster pump stations. This includes water main
<br /> extension and/or replacement projects for the Cities of Weston, Pembroke Pines, Miramar, North
<br /> ® Lauderdale, Miami Beach, Dania Beach, Hollywood, Lauderhill, and the Towns of Davie, Surfside, and Bay
<br /> Harbor Islands. In addition, we have modeled existing water distribution systems for the Cities of Weston,
<br /> • and Lauderhill, as well as the Town of Davie. This involved assembling existing as-built, permit, and atlas
<br /> • data, and supplementing it with surveyed field data to build the existing model in WaterCad. CGA then
<br /> • proceeded to model improvements into the system for enhanced system performance, to account for future
<br /> demands, and to accommodate future anticipated redevelopment. The modeled improvements were
<br /> ® prioritized, budgeted and included in the Capital Improvement Plans for the municipality.
<br /> • Our wastewater experience includes the design, permitting, and construction of collection systems,
<br /> • transmission systems, lift stations, master pump stations, in-line booster pumping stations, and force
<br /> • mains. CGA has or is currently in the process of modeling the existing wastewater transmission systems
<br /> • (lift stations and force mains) for the Cities of Weston, Pembroke Pines, Opa-Locka, Cooper City, Dania
<br /> Beach, and the Town of Davie. As with the water distribution system models, we assembled existing as-
<br /> built information, permit information, and atlas data, and supplemented it with surveyed field data to build
<br /> • the existing computer model. Similar to the water distribution system evaluation and analyses, CGA
<br /> • modeled improvements into the system for enhanced system performance, to account for future demands,
<br /> and to accommodate future anticipated redevelopment. The necessary improvements were then
<br /> • integrated in the municipality's Capital Improvement Plan. In addition, CGA recently performed an l&I
<br /> • study on the wastewater collection system of the Town of Surfside.
<br /> ® Our team has provided designed pump stations for variety of application including storm water, shallow
<br /> wells, deep wells, wastewater lift station, wastewater effluent disposal, potable water distribution, and S in-
<br /> line booster station. As such, we have worked with and coordinated with all design disciplines including
<br /> structural, electrical, and instrumentation and controls. We have experience with a variety of pumps and
<br /> • pump station types. As part of the pump station design we also provided hydraulic modeling, solids
<br /> ® removal facilities (i.e. bar racks, strainers) design and emergency power fuel system design. We have
<br /> worked on pumps with capacities ranging from 0.1 MGD to 200 MGD (320 CFS).
<br /> •
<br /> CGA has designed, permitted, and managed the construction of new lift stations, and lift station
<br /> rehabilitation projects for the Cities of Weston, Pembroke Pines, Dania Beach, Miramar, North Lauderdale,
<br /> • Hollywood,Cooper City,Opa-Locka, and the Town of Davie
<br /> Storm Water Management
<br /> CGA has been the Drainage/Storm Water Management Engineer for the South Broward Drainage District
<br /> • (SBDD) since 1990. The firm was originally contracted to develop the first and only district-wide basin
<br /> • hydrologic and hydraulic analysis and storm water comprehensive plan. CGA is also the District Engineer for
<br /> • Indian Trace Development District and Bonaventure Development District
<br /> �-. and has completed basin wide hydrologic and hydraulic modeling, including
<br /> ® 75 se a
<br /> `
<br /> ITC hfa• ir 7: s?; the master drainage system modeling, analysis and pumping station
<br /> :i•rete l upgrades, large-scale mitigation/ wetlands plans and the updates of the
<br /> +��, '
<br /> e� ;; comprehensive plan. CGA uses the latest in advance computer-assisted
<br /> "744 '1%,: software technologies such as Advanced Interconnected Pond Routing
<br /> • , - ' -R�r;: (ADICPR), Hydraflow,Cascade and other current computer programs.
<br /> •
<br /> ® RFQ#12-04-02,Construction Management Services Page 21 3