My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano - Construction Management
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Calvin Giordano
>
Calvin Giordano - Construction Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 11:07:38 AM
Creation date
2/2/2016 10:56:15 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> • cgo\ ,I Calvin. Giordano S Associates, Inc. <br /> JEXCEPTIONAL SOLUTIONS <br /> • a•2S <br /> ® Process <br /> The process we employ is equally as important as the equipment we deploy. All survey requests are <br /> • assigned to a licensed surveyor and mapper who acts as the project manager. In addition, fieldwork is <br /> • researched and calculated in the office for the crews prior to going out into the field. The required data is <br /> ® collected electronically using total station instruments, and then downloaded at the end of the day into our <br /> computer system for analysis and processing. This data is then provided to our technicians to create the <br /> • final product, all under the watchful eye of the project manager. The final product is delivered to the client <br /> • after undergoing our Quality Assurance/Quality Control process. <br /> • Safety <br /> • Safety is a primary concern at Calvin Giordano &Associates. Therefore, a mandatory maintenance of traffic <br /> • (MOT) training is held twice a year for our field crews and field crew supervisors. Monthly Safety meetings <br /> are held for the field personnel with a different topic discussed each month. Our field vehicles are <br /> • equipped with strobe lights, proper signage,safety vests and cones. <br />•• One-Stop Shopping <br /> • The Surveying and Mapping Division offers the services, staff and technology to ensure that every survey <br /> • project is executed successfully, and to our clients' satisfaction. Our land survey and mapping services <br /> • include: <br /> • • Boundary surveys • Utility and infrastructure layout <br /> • • Record (as-built surveys) • Prepare legal descriptions <br /> • o Sub-surface utility location surveys • Hydrographic survey <br /> • Platting services • Route survey for engineering design <br /> • • Right-of-way napping • Condominium document preparation <br /> • o Topographic surveys • Annexation maps <br /> ® Diverse Clientele-Cities, Utilities and the General Public <br /> • The Surveying and Mapping Division client base includes land development clients, FPL, Florida <br /> • Department of Transportation, Broward County Real Property Division and many cities within Broward, <br /> • Miami-Dade and Palm Beach Counties, as well as the general public. <br /> • Survey Crews and Equipment <br /> • The Survey department maintains seven (7) field crews out of the Fort Lauderdale office and three (3) field <br /> ® crews out of our West Palm Beach office. Our firm has nine (9) survey grade GPS systems available and we <br /> are capable of both static and RTK GPS surveying. <br /> ® A standard inventory of survey equipment for each crew includes: <br /> 0 • Total Stations data collectors and levels • Tracemaster Pipe and Cable Locator <br /> • o Hydrotrac HT 100 Echo Sounder o Leica Scan Station II <br /> ® o Geopack CAICE, EFB,CEFB • AutoCAD <br /> * Civil 3D 2008 • VSI VaXcavator(slurry excavation system) <br /> 5 o Microstation V8 • Trimble Geomatic Office <br /> • o Vector(GPS baseline processing) • AutoCAD LDD 2008 <br /> • o Cyclone 5.6 Laser Scanning software <br /> 0 <br /> 1110 <br /> • _ ___ <br /> RFQ#12-04-02,Construction Management Services Page 215 <br />
The URL can be used to link to this page
Your browser does not support the video tag.