Laserfiche WebLink
® <br /> 'W <br /> ® I Calvin, Giordano 5 Associates, Inc. <br /> :� 0 <br /> \ F T C f P 1 1 J N A l S O I U I I O V s <br /> ® ATLANTIC ISLES ROADWAY AND UTILITY IMPROVEMENTS <br /> ® Sunny Isles Beach, Florida <br /> ® :-------, . <br /> ® -� <br /> ® r� �l Client <br /> G <br /> �� 14j�� `� f ,y ,,ot' ` rti ,s• ' City of Sunny Isles Beach <br /> • ( f <br /> ® I4'; <br /> f h t <br /> IR.'S "' u. �k ewe.-- t .=i33 at .. ��-/�-'1'✓-.. f:Jo?? ar.1 �' •3igr`F 1 ���: Contact information <br /> ® �� /: ; ,.6.:-:-..it, <br /> �r` �. Irk t N:y;�t ;' .3,11 ' at time of project: <br /> f f itMyf1l I •r ii '`I Iti t �t -..1,41,,;H:/... v <br /> IJ✓� Rick Conner, PE <br /> ® II a J li .;A::A �: ti e. City Manager <br /> :40- -'.. Tij' *, 44' 113'14 % 18070 Collins Avenue <br /> • <br /> Sunny Isles Bch, FL 33160 <br /> —� = . _ <br /> (305) 792-1928 <br /> ,> a <br /> rconner@sibil.net <br /> • lair;..t 2.S[. t `r �-,a a _- . V .It Project Date <br /> 2008-2011 <br /> • <br /> ® The City of Sunny Isles Beach retained CGA to provide construction management services for Services Provided <br /> • the Atlantic Isles Roadway and Utility Improvements project. CGA's scope of services Construction Administration <br /> includes: Civil Engineering <br /> ® Construction Administration: Utility Relocation <br /> ® • Assist in bidding process, including pre-bid, bid opening, recommendation of award and Roadway Design <br /> contract execution <br /> ® • Meet with contractor and appropriate regulatory agencies when requested, and Principal in Charge <br /> ® necessary for consultation or conferences in regard to construction of the project Dennis J.Giordano <br /> • Issue interpretations and clarifications of the contract documents and evaluate requested <br /> ® deviations from the approved design or specifications. In connection therewith, review, Project Manager <br /> ® prepare and process any work change directives or change orders requested by the <br /> contractor or city Sabrina M. Baglieri <br /> ® • Review and process shop drawings,samples and other data which the contractor is required <br /> ® to submit Team Members <br /> • Make daily inspections for compliance with plans and specifications. Make interim Don Windham <br /> ® inspections for substantial completion; review, approve and process pay requests and Wesley Greaves <br /> ® perform a final inspection to determine, in general, if the work has been completed in <br /> conformance with the intent of the contract documents <br /> ® • Review and process as-built and closeout packages Construction Cost <br /> ® • Civil plan reviews for quality control 32,885,048.00 <br /> • Permit applications and certifications <br /> ® <br /> Civil/Roadway Improvements: <br /> le • Construction of roadway improvements, including construction of sanitary sewer <br /> ® collection system with gravity sewer lines,manholes,WASD lift station and force main <br /> • Paving,grading,and drainage improvements <br /> ® • Installation of a new water main with services proposed by the City of North Miami <br /> ® Beach <br /> Utilities: <br /> ® • Coordinate and assist the City undergrounding of certain utilities, such as FPL power, <br /> ® CATV,and telephone <br /> • <br /> ® Page 2115 <br />