Laserfiche WebLink
0 <br /> • ;a Calvin, Giordano 8 Associates. Inc. <br /> 0 �'o`C 1. E M C E P I I 0 N A L SOLUTIONS <br /> • X11 T1 <br /> • TOWN OF MANGONIA PARK UTILITY ENGINEER <br /> • Mangonia Park, Florida <br /> 4 <br /> tr, <br /> ® i. <br /> ® i 1 __ <br /> _ �', E ' i Client <br /> �— Town of Mangonia Park <br /> ®• ' li <br /> ' -, Contact information <br /> (!:. <br /> , at time of project: <br /> • T® 1 �, LeeLeffingwell <br /> ® ,t 1755 East Tiffany Drive <br /> 11 - s Mangonia Park, FL 33407 <br /> • _ . I A- I ,f.,,�_ F 561.848.1235 (Phone) <br /> ® • r • ._a 561.848.6940(Fax) <br /> 3 I left ingwe l l @town of mang o <br /> • , .> I .W =. A. 5 niapark.com <br /> • <_ —r ,. - \� k i <br /> . ) i V Project Date <br /> • 1 <br /> • _ '~ IL t•1 �E! -E i ,.'1 10/2007—Ongoing <br /> r bcasiiin Ali !‘ <br /> 114 <br /> ia_ ' Jr' r-= X1`.'1 �.l Services Provided <br /> • "'It <br /> r l� . �1� '� T , <br /> F " <br /> ® Ct ....ILL :r _ 1 , - IF 1: `'7�'r5. ,-- O�- CEI <br /> • Civil Engineering <br /> • Construction Mgmt <br /> CGA was awarded an annual contract in 2007 to provide the Town of Mangonia Park Survey& Mapping <br /> ® with professional engineering services in relation but not limited to their water Utility Engineering <br /> • distribution and wastewater collection systems and water treatment plant. As part of Utility Plan Review <br /> the ongoing contract, CGA performs utility site plan reviews and offers alternatives to Grants <br /> ® better suit the existing site plan and Town's utility infrastructure requirements. CGA Principal-in-Charge <br /> • also serves as the utility engineering consultant to the Town. <br /> Karl Kennedy,P.E. <br /> • CGA has also aided the Town with federal,state and local grant writing and has obtained <br /> • over $1 million in grants for the Town's water treatment plant, drainage system and Project Manager <br /> • community center. <br /> Patrick Figurella, P.E. <br /> • CGA recently completed the construction management of a $465,000 Palm Beach <br /> ® County Community Development Block Grant awarded to construct a new 100,000 Project Team <br /> gallon elevated storage tank. Ronnie Furniss, PSM <br /> • Various other projects completed for the Town include: George Krawczyk, P.E. <br /> • • Surveying Company Role <br /> • • Legal sketch and descriptions for easements <br /> • � Utility studies/investigations Prime <br /> Ammonia feed system as-built and permit final certification at water plant <br /> • • Operation and maintenance manual and emergency response plan for water Consultant Cost <br /> • plant $65K per year <br /> • 10-year water supply plan for South Florida Water Management District <br /> • • Coordination with Palm Beach County Health Department for water plant <br /> • <br /> • <br /> O Page 21 23 <br />