My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano - Construction Management
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Calvin Giordano
>
Calvin Giordano - Construction Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 11:07:38 AM
Creation date
2/2/2016 10:56:15 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® oo jj Calvin, Giordano & Associates, Inc. <br /> - �J'•`C A 1 E x C E P i I O N A L SOLUTIONS <br /> ® , <br /> ® LIFT STATION NO. 1 <br /> ® Davie, Florida <br /> Client0 <br /> ® i <br /> — .! f <br /> _ , . . ,ijr - . a� ( _ <br /> Town of Davie <br /> ® , c . .a • Contact information <br /> -t.1 "� • at time of project: <br /> rite." - ''y Bruce Taylor <br /> ® .} < �"fr „ Qt+�Y'�k Utilities Director <br /> ® t� ' • �' ; 6591 Orange Drive <br /> ® s , q - rDavie,Florida 33314 <br /> d (954) 327-3742 <br /> — - Project Date <br /> ® K <br /> ® - I.4 2009-2013 <br /> ® a( CGA Fees <br /> ~ � Q <br /> 4. 14 <br /> ® : , it "'fit �e . 549,610 <br /> ® — + " - Services Provided <br /> ® Engineering <br /> 0 a - Permitting <br /> • <br /> :, • <br /> Principal-in-Charge <br /> ® `. _ Dennis J.Giordano <br /> 0 -... <br /> 0 . -.4---,—. ---- --------r_ `_: _ ,., <br /> ® <br /> Calvin, Giordano &Associates, Inc. (CGA) re-designed and relocated Lift Station No. 1 to <br /> accommodate the construction of the new wastewater treatment plant on the University <br /> ® of Florida site. The existing service area for Lift Station No. 1 consists of residential and <br /> 0 commercial areas located east of Davie Road and the north of Griffin Road. Sixteen <br /> smaller lift stations contribute sanitary flow to the gravity sewer system which flow into <br /> 0 PS.1.The pump station discharges into a 16 inch force main which traverses south along <br /> ® 61th avenue 11600 LF to Lift Station No. 8. <br /> ® The new location for LS No. 1 is approximately 50 feet west of the existing LS No. 1. The <br /> ® design included complete engineering for the wet well, pumps, valve pit, piping, valves, <br /> conduit control panel, site grading and electrical service. The project was also <br /> ® permitted through Broward County EPD and State of Florida DEP, and certified by CGA. <br /> 0 <br /> 0 <br /> 5 Page 21 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.