Laserfiche WebLink
0 <br /> ® PIA II Calvin. Giordano S Associates. Inc. <br /> PIA <br /> ' EXCEPTIONAL SOLUTIONS <br /> ® Robert Jackson, PSM,Page 2 <br /> ® City of Pembroke Pine Boundary survey for a 167-acre parcel, Broward County, Florida. In addition <br /> 0 to the information provided by the client, research was required for adjoining ownerships and right-of-way <br /> maps for 1-75 corridor as well. The survey was accomplished using and overall static GPS traverse that <br /> ® included sectional work along with conventional sub-traverses utilized for finding or setting property <br /> ® corners and locating improvements. At the completion of the AUTOCAD drawing all aspects of the project <br /> were reviewed for completeness and compliance with Minimum Technical Standards (MTS). <br /> ® Dania Cove, Dania Beach, Florida. Prepared a Boundary and Topographical survey that delineated mean <br /> high water along the Dania Cut-Off Canal. All in accordance with the State of Florida minimum technical <br /> ® standards for land surveys as defined by Chapter 5J-17.05 of the Florida Administrative Code. <br /> City of Lauderhill, Florida, Storm Water locations-GPS:Project Manager responsible for all survey <br /> 9 aspects of this project. Project involved locations of catch basins and outfalls with the Global Positioning <br /> ® System (GPS). Performed quality control throughout the project. Coordinated weekly meetings to assure <br /> the project was on time and on budget. <br /> 0 City of Weston, Florida, Sign Inventory-CPS (City of Weston Surveyor): Project Manager responsible <br /> 9 for all survey aspects of this project. Project involved locations of City signage. This included informational <br /> ® signs and all traffic signs throughout the City. Survey Crews cataloged, height, type of sign and condition <br /> ® with the Global Positioning System (GPS). Performed quality control throughout the project. Coordinated <br /> weekly meetings to assure the project was on time and on budget. <br /> ® City of Weston, Florida, Stormwater Improvements-GPS: Project Manager responsible for all survey <br /> 9 aspects of this project. Project involved locations of catch basins and outfalls with the Global Positioning <br /> ® System (GPS). Performed quality control throughout the project. Coordinated weekly meetings to assure <br /> the project was on time and on budget. <br /> 0 <br /> 0 <br /> 0 <br /> Page 31 8 <br />