Laserfiche WebLink
O <br /> ® . re-y,„ I Calvin. Giordano & Associates, Inc. <br /> • ' f E % C E P T I O N A E SOLUTIONS <br /> �.1 1 <br /> ® Our water experience includes the design and permitting of new water distribution networks, water <br /> distribution system replacements and upgrades, and booster pump stations. This includes water main <br /> extension and/or replacement projects for the Cities of Weston, Pembroke Pines, Miramar, North <br /> ® Lauderdale, Miami Beach, Dania Beach, Hollywood, Lauderhill, and the Towns of Davie, Surfside, and Bay <br /> Harbor Islands. In addition, we have modeled existing water distribution systems for the Cities of Weston, <br /> ® and Lauderhill, as well as the Town of Davie. This involved assembling existing as-built, permit, and atlas <br /> o data, and supplementing it with surveyed field data to build the existing model in WaterCad. CGA then <br /> ® proceeded to model improvements into the system for enhanced system performance,to account for future <br /> demands, and to accommodate future anticipated redevelopment. The modeled improvements were <br /> A prioritized, budgeted and included in the Capital Improvement Plans for the municipality. <br /> 0 Our wastewater experience includes the design, permitting, and construction of collection systems, <br /> transmission systems, lift stations, master pump stations, in-line booster pumping stations, and force <br /> 0 mains. CGA has or is currently in the process of modeling the existing wastewater transmission systems <br /> h (lift stations and force mains) for the Cities of Weston, Pembroke Pines, Opa-Locka, Cooper City, Dania <br /> V Beach, and the Town of Davie. As with the water distribution system models, we assembled existing as- <br /> built information, permit information, and atlas data, and supplemented it with surveyed field data to build <br /> ® the existing computer model. Similar to the water distribution system evaluation and analyses, CGA <br /> ® modeled improvements into the system for enhanced system performance, to account for future demands, <br /> and to accommodate future anticipated redevelopment. The necessary improvements were then <br /> ® integrated in the municipality's Capital Improvement Plan. In addition, CGA recently performed an I&I <br /> CO study on the wastewater collection system of the Town of Surfside. <br /> ® Our team has provided designed pump stations for variety of application including storm water, shallow <br /> ® wells, deep wells, wastewater lift station, wastewater effluent disposal, potable water distribution, and in- <br /> line booster station. As such, we have worked with and coordinated with all design disciplines including <br /> structural, electrical, and instrumentation and controls. We have experience with a variety of pumps and <br /> ® pump station types. As part of the pump station design we also provided hydraulic modeling, solids <br /> ® removal facilities (i.e. bar racks, strainers) design and emergency power fuel system design. We have <br /> worked on pumps with capacities ranging from 0.1 MGD to 200 MGD (320 CFS). <br /> CGA has designed, permitted, and managed the construction of new lift stations, and lift station <br /> rehabilitation projects for the Cities of Weston, Pembroke Pines, Dania Beach, Miramar, North Lauderdale, <br /> ® Hollywood,Cooper City,Opa-Locka, and the Town of Davie <br /> ® Storm Water Management <br /> CGA has been the Drainage/Storm Water Management Engineer for the South Broward Drainage District <br /> ® (SBDD) since 1990. The firm was originally contracted to develop the first and only district-wide basin <br /> ® hydrologic and hydraulic analysis and storm water comprehensive plan. CGA is also the District Engineer for <br /> Indian Trace Development District and Bonaventure Development District <br /> ® t "�.. s ' and has completed basin wide hydrologic and hydraulic modeling, including <br /> =jlr.l"�"'> t pr91", the master drainage system modeling, analysis and pumping station <br /> ® 4 ; .1 0- yo r - � 'r upgrades, large-scale mitigation/ wetlands plans and the updates of the <br /> Y.aE� ` )Vit. comprehensive plan. CGA uses the latest in advance computer-assisted <br /> ® - software technologies such as Advanced Interconnected Pond Routing <br /> ® fes--_. - „ (ADICPR), Hydraflow,Cascade and other current computer programs. <br /> 0 <br /> 0 <br /> 0 <br /> ® RFQ#12-04-02,Civil/Environmental Engineering Page 213 <br />