Laserfiche WebLink
• <br /> • , oA 1 Calvin, Giordano & Associates. Inc. <br /> E X C E P 1 I O NA l 5 0 l U 1 ION 5 <br /> • <br /> • <br /> • PINES BOULEVARD/I-75 INTERCHANGE <br /> • FDOT LAP PROJECT <br /> • Broward County, Florida <br /> ® <br /> - wT __ ,. """ ..� Client <br /> taw: �i � <br /> .-a,., NF,�l ,-, �+? : -.. . ,� City of Pembroke Pines <br /> ® F+s- .fie.. y'x' X R r Rt'5i7L^r-=d'2�' s <br /> ® i.: -tt -ri .- , r„�� —s.-- a..- y r �i ° through a Loral Agency <br /> X-rt : ..1r. .i, of �.t.x r t <br /> TA.. ,C"—,::: a X,tro �,5 y r -- ✓`.. d ere r ;-- Program (LAP)Agreement <br /> • , at ti�A : ,,�,ss. r , • i with the Florida Department <br /> "-I' � � \ ' of Transportation District IV <br /> • <br /> 3 Cof !! , <br /> taon <br /> ® �_ _ `' �� at• / " �-'fix JoPE <br /> • .a'a ;�j w 13975 Pembroke Road <br /> • s ;y4 Pembroke Pines,FL 33027 <br /> i;-"i: h ?"9 ._► (954)435-6511 <br /> ® c/ . ' / c` ` a`"3 '- . 4 - r r (954)435-6755 (Fax) <br /> ® -- I •j":-t.:;:';',-.;-.:-.1!- --f.-.4"' <br /> -.- ,` FDOT District IV <br /> • ,. .\ :\ • -a\ - Project Coordinator <br /> Y A.1 <br /> • �` "�; , Leslie Wetherell, PE <br /> • `, ate; <br /> 3400 W. Commercial Blvd. <br /> Fort Lauderdale, FL 33309 <br /> • ` y ';411i, (954) 777-4438 <br /> • CGA is currently in the post-design phase for the Pines/l-75 interchange project. The Project Date <br /> ® purpose of this City of Pembroke Pines/FDOT LAP project was to realign the existing 2006-2009 <br /> • free-flow entrance and exit ramps at the SR-820 (Pines Boulevard) / 1-75 interchange <br /> • due to development in the corridor. The re-aligned ramps will be perpendicular to SR- Services Provided <br /> • 820, and traffic will be controlled through signalized intersections at the ramps. The Roadway <br /> project also involves widening both Pines Boulevard and the entrance and exit ramps, Signing& Marking <br /> • providing additional turn lanes in order to improve traffic flow through the interchange. Signalization <br /> • The limits of this project extend from Grand Palms Drive to 1361h Avenue. Landscape Architecture <br /> Electrical Engineering <br /> • Other work performed includes Pines Boulevard median and curb ramp modifications, <br /> • roadway widening and lane shifting, addition of guardrail and impact attenuators, Key Personnel <br /> • extensive drainage design, and detailed signalization plans. The MOT plans were a Ray Pippin,PE <br /> critical project component, and included an FDOT lane closure analysis as well as Jenna Chamberlain, PE <br /> • detailed multi-phased construction plans for all interchange construction work. <br /> • Considerable utility coordination was also required for this project, as the Pines Project Cost <br /> Boulevard corridor is used as a backbone of utility distribution for this area. The CGA $12,750,000.00 <br /> • Traffic Department prepared both the MLOU and IOAR for the project. Project plan Construction <br /> • components consist of Roadway, Signing & Marking, Signalization, Landscape <br /> Architecture and Electrical plans. CGA also performed all survey work needed for the S 1,360,000.00 (Design) <br /> • design of this project. Reports prepared for this contract include a Lighting Justification <br /> • Report, Design Report, Drainage Report, Typical Section Package, and Pavement Design <br /> • Package. CGA also applied for & received variances from the Department of <br /> Transportation for signalization & shoulder width where required within the project <br /> • corridor. <br /> • 7 12-4942 SIB HO_Pines I-75 InterchangeLAP Page 21 15 <br /> 0 <br />