Laserfiche WebLink
0 <br /> ® Atn I Calvin. Giordano & Associates. Inc. <br /> C 1 E % l E P I 1 O N A L SOLUTIONS <br /> ® 4 <br /> ® COMMUNITY ENHANCEMENT (CEP) <br /> ® WATERMAIN REPLACEMENT PHASE III <br /> ® Bay Harbor Islands, Florida <br /> 0 _ • <br /> , >a Client <br /> rg ----••-- <br /> Town of Bay Harbor Islands <br /> ® [j E o, <br /> ® «.l �.�, •f- r°vari... Is�m.i� 11f� ~.- I .. s Contact information <br /> �, sseer a.urt. >tterrarr �'t .-10 <br /> ® _ :a" �ia� '-°°"°" r - at time of project: <br /> ® , - ' 'J = Randy L.Daniel, P.E. <br /> Town Engineer <br /> ® ".01IMP—t ! r Town of Bay Harbor Islands <br /> - ' .� <br /> ® 9665 Bay Harbor Terrace <br /> Bay Bay Harbor Islands, FL <br /> ® L s4•' tz. i-E•1. eqPa33154 <br /> ® g 305.861.1799 <br /> 1 I r.x� <br /> ® }�y . 1 Project Date <br /> ® ILL ~1I r -moi l i.• _ "€3'. 2009 to Present <br /> ---._• • . ,'-,-----"L---: -; Services Provided <br /> ® xpAl ;�,;`" - Civil Engineering <br /> Construction Administration <br /> ® ITOTTal EWSVee5 dud Bay HertntTerrace Proposed Improvements and Inspection <br /> ;n ftlieftflRoadway Improvements [Harbor Islands O <br /> A Principal-in-Charge <br /> ® Karl Kennedy, PE <br /> O The project consists of the addition of water main to the east-west streets located Project Manager <br /> ® within the Community Enhancement Project (CEP) Phase Ill on the east island. This <br /> involves the replacement of approximately 12,000 LF of water main. The original water Patrick figurella, P.E. <br /> ® main system currently located in the rear of the existing lots is being replaced by the Key Personnel <br /> O new water mains. The new water main will be located in the road right of way during <br /> ® the overall CEP Phase III project. George Krawczyk, PE <br /> Greg Clements,PSM <br /> ® Calvin, Giordano & Associates, Inc. is providing surveying, civil engineering and Sabrina Baglieri <br /> ® construction management services for the project.The new water main extensions were <br /> ® permitted through the Miami-Dade Water and Sewer Department, the Miami-Dade Company Role <br /> Health Department, and Miami-Dade Environmental Resource Management. The Prime <br /> ® project is under construction at this time. <br /> 0 Firm Fees <br /> ® 5250,000 <br /> ® Construction Cost <br /> ® $2,300,000 <br /> 0 <br /> O Page 21 26 <br />